Home – Global Blog › Forums › The Hearty Salon › Chronicles of the Apocalypse – 06 Aug 2024

Viewing 63 reply threads
  • Author
    Posts
    • #37835
      AHH
      Blocked

      🇷🇺💬 Chairman of the Russian State Duma Vyacheslav Volodin:

      [August 06 is a] Black day.

      79 years ago, a terrible tragedy occurred – hundreds of thousands of civilians died as a result of the US atomic bombing of the city of Hiroshima. A few days later, the same fate befell Nagasaki .

      There was no military necessity for this.

      Washington later began to use nuclear weapons to intimidate other countries : they burned Vietnam with napalm, invaded Korea, Afghanistan and Iraq, and bombed Yugoslavia, Libya and Syria.

      Time goes by, but US methods do not change.
      They have turned Ukraine into a staging area for war with our country. They are expanding NATO infrastructure in the regions of Asia against China. They are carrying out missile strikes on peaceful cities in Iran with their allies.
      They kindle new conflicts and fuel old ones.

      The United States remains the only country to have used nuclear weapons. But if 79 years ago they were the only ones to have them, today the situation has changed. The presence of nuclear potential in Russia and China is a deterrent to the aggressor.

      Moreover, the high-tech weapons developed in our country recently allow us to speak of an advantage over the USA.

      Therefore, when Washington and Brussels, threatening Russia’s security, supply planes and missiles, and coordinate military actions in Ukraine, the parliaments and citizens of the United States and the European Union must understand that the actions of the insane leaders of their states can lead the world to tragic consequences.
      @DDGeopolitics

    • #37851
      AHH
      Blocked

      💠@Middle East Spectator:
      ⭕ Even Iranian media makes fun of Biden. This is just getting sad.
      ⭕ Just a thought: The U.S. may not have seen any indications of an impeding attack because Iran is not planning to launch its missiles from mobile launchers, which requires staging that can be picked up by intelligence like satellites etc.

      Rather, it plans to use underground missile silos, which can launch several missiles instantaneously without any observable pre-staging; an attack with virtually no warning.

      💠@Fotros Resistance:
      ⭕ Tasnim’s military correspondent:

      “Recently, there have been reports about the arrival of Russian electronic warfare systems in Iran. I don’t have an opinion on the accuracy of these reports. However, it seems that the Russian systems and advisors have been significantly aiding the Iranian armed forces in detecting signals and frequencies of American systems stationed in neighboring countries of Iran.”
      ⭕ Ain al-Assad US base was subjected to another (2nd) rocket attack, moments ago.
      [both were overnight, late last night]
      ⭕ An Iranian jewish parliament member calls for retaliation against israel for the violation of Iran’s sovereignty and assassination of Ismail Haniyeh.
      ⭕ 🚨 Many drone alerts activated due to a drone that’s flying from South Lebanon towards the western Galilee all the way towards Nahariya & Akka
      ⭕ Footage shows the Hezbollah drone in the skies of Nahariya |media|
      ⭕ According to alleged reports, the Hezbollah drone either hit & impacted a car, or dropped explosives on it causing for the injury of those inside of it, between Nahariya – Akka. |media|
      [this is the now routine back N forth. The real coordinated assault will be measurably more]
      ⭕ At least 2 injuries in severe condition.
      ⭕ According to the available footage, there were 2 Hezbollah drones
      ⭕ According to Israeli Hayom:

      One of the Hezbollah drones hit a military facility between Akka and Nahariya.

      There were at least 2 drones, one hit a car and the other the military facility it seems.
      ⭕ The injured israelis are rushed to the hospital. Their condition is severe according to reports. There are at least 2 injuries.
      ⭕ 🚨 Renewed drone alerts in Akka
      ⭕ Head of the Mateh Asher Regional Council, Moshe Davidovitch:

      Hezbollah’s drones breached our entire air defense system and reached as far as Akka, this created chaos here. The failed regime of israel is abandoning us and leaving us to fend for ourselves.
      [O vey!]
      ⭕ 🟡 Hezbollah CONFIRMS:

      In response to assassination carried out by the Israeli enemy in the town of Abba, we launched an squadron of drones targeting:

      🔻The HQ of the Golani Brigade
      🔻621st Egoz Unit in the “Shraga” barracks.
      ⭕ Even during their highest alertness awaiting retaliation, 2 Hezbollah drones just casually breached israel’s entire defense systems and successfully hit their targets all the way in Akka lol.

      Israeli settlers really should pack their bags and leave, your beloved crooked regime aint protecting you.

      💠@Hamas/Tsahal:
      ⭕ U.S. Senator Graham yesterday: To our friends in Israel:

      If you are attacked by Iran and Hezbollah tonight, hit back and hit hard. |media|
      [the need to give spine to the melting cowards conflicts with maintenance of plausible deniability! The scent of the Rapture also erodes what little sense the degenerates had. It is a blessing to have zionazis like Senator Graham to make crystal clear where the Last Satanic Empire stands, stark naked without any fig leaves]

      💠🌎🛡GEOPOL360🕊🌍:
      ⭕ 🇩🇪🇵🇭 Philippines, Germany agree to conclude defense pact this year

      The Philippines and Germany have pledged to sign a defense cooperation agreement this year, promising to uphold the rules-based international order in the region.

      German Defense Minister Boris Pistorius and his Philippine counterpart Gilberto Teodoro have pledged to establish long-term relations between their armed forces to develop bilateral training and exchanges, explore possibilities for expanding bilateral armaments cooperation and engage in joint projects.

      The meeting in Manila was the first such visit by a German defence minister, as the two countries celebrate 70 years of diplomatic relations.
      [the persistence in painful suicide by the deranged West is mesmerizing!] 

      💠@Intel Slava Z:
      ⭕ A second rocket attack has been reported on the US base at Ain al-Asad in Iraq.

      As a result of the first shelling several hours ago, five American soldiers were wounded.
      ⭕ The F-16 fighters transferred to Ukraine, according to preliminary information, are based in Romania , and enter the airspace of the Odessa region through Moldova, for fear of being shot down by Russian air defense systems and the Russian Aerospace Forces.
      ⭕ 🇨🇳China has unveiled a hybrid drone capable of taking off from underwater. It could potentially be used on military submarines. |media|
      ⭕ ⚡️The Ukrainian Armed Forces tried to break through to the territory of the Kursk region [of Russia proper], the fighters of the FSB Border Service and the Russian Armed Forces did not allow the breakthrough – acting governor
      ⭕ ❗️Poland is ready to evacuate its citizens from Israel — MFA
      [include Mileikowsky!]
      ⭕ ⚡️Germany prepares to evacuate its citizens from Lebanon and other Middle East countries via Cyprus, fearing escalation of conflict between Israel and Iran – Cyprus Broadcasting Corporation
      ⭕ Reports in Lebanon: 4 killed in an Israeli attack in the village of Meifdon in the Nabatia region – north of Litani

    • #37852
      Mr P
      Participant
    • #37858
      AHH
      Blocked

      💠 @Strategika51:
      ⭕ Lebanese Hezbollah drones over the Galilee. It seems that the playful activities of Hezbollah’s sporty drone enthusiasts are starting to spill over a little…

      It’s worth noting that this is happening at a time when the entire empire is up in arms over this small part of the world.

      There’s no stopping enthusiasts.
      ⭕ The psychological warfare continues, and this time the target is Netanyahu.

      In this video, the message has the merit of being brief, clear and precise; ” Netanyahu, you’re the next target! Prepare to die “. |media|

      💠 @Middle East Spectator:
      ⭕ This morning, a Hezbollah suicide drone struck in northern Israel, killing one Israeli directly and injuring others; it passed all defenses undetected

      💠 @Hamas/Tsahal:
      ⭕ According to Israeli news service Channel 14, Russia has reportedly transferred Iskander missile systems and Murmansk-BN electronic warfare systems to Iran.

      The transfer was reportedly carried out using an IL-76 military transport plane, which made several flights between Russia and Iran.

      Until now, Iran was not known to possess such weapons and there had been no public discussion about their transfer.

      This suggests that Russian personnel could accompany the equipment to operate it, as it is unlikely that Iranian specialists have received training on these systems.

      The Murmansk-BN systems are designed to suppress satellite navigation and communication at distances of up to 5,000 km.

      The Iskander systems have a range of up to 500 km, but Iran would need missiles with a range of about 1,200 km to reach Israel. However, the Iskander K model could reach 1,500 km.
      [See the Iskander video I posted yesterday! In last thread. The shorter range variant would be ideal against USUK bases surrounding Iran.. Iskander has a nuclear variant… this missile system really puts NATO’s Knickers in knots]

      💠 @Intel Slava Z:
      ⭕ 🇷🇺🇺🇦Shoigu stated that the Ukrainian Armed Forces have lost 115 thousand personnel since mid-June.
      ⭕ 🇷🇺🇺🇦Official statement of the FSB on the Kursk border:

      On the morning of August 6, 2024, the Armed Forces of Ukraine committed an armed provocation on a section of the state border of the Russian Federation within the Kursk region.

      Border settlements in the Kursk region were subjected to shelling.

      Border guards, together with attached units of the Russian Armed Forces, have taken measures to repel armed aggression.
      ⭕ 🇷🇺🇺🇦The attack of the khokhol in the Kursk region is not just a TikTok action. In fact, this is most likely the beginning of another desperate attempt by the khokhol to approach the negotiations with a “strong position”. They have not been talking about victory in Ukraine for a long time, now they are thinking about how to persuade Russia to keep fewer liberated territories for itself and not to give up Kherson and Zaporozhye. Kiev strategists decided that by gathering more human flesh and throwing it into the attack, they will force Russia to retreat, leave part of the “old” territories and then exchange them for new ones. Everything will end with a severe defeat of the khokhol and huge losses.

      💠 @DDGeopolitics:
      ⭕ 🇦🇿🇷🇺Aliyev met with Shoigu in Baku, the press service of the Azerbaijani president reported
      [Making the rounds, on way home!]

    • #37860
      Mr P
      Participant

      https://www.rbth.com/science-and-tech/332100-what-is-iskander-m

      “The Iskander-M tactical missile system includes a total of 51 pieces of equipment: 12 launchers (each with two missiles), 12 transport-loading vehicles, 11 command vehicles, 14 life-support vehicles, one technical support vehicle, a communications processing center, plus sets of precision-guided missiles, ammunition, and training tools.”

      They’re not “ballistic” they jink around, in flight, ie very difficult to intercept.

      “…use seven types of missiles that are totally indistinguishable to the naked eye and can be equipped with as many as ten kinds of warheads….”  and release decoys!  

    • #37862
      AHH
      Blocked

      💠 @Sputnik Africa:
      ⭕ ❗️Ukrainian forces suffered losses of up to 1,535 personnel over the past day, according to a report from the Russian Ministry of Defense

      More statements from the ministry’s daily report:
      ▪️ A US-made AN/TPQ-36 counter-battery radar station, three ammunition storage sites, a UK-made “Braveheart” self-propelled artillery unit, and additional foreign military equipment were destroyed;
      ▪️ Air defense systems shot down six HIMARS rockets manufactured by the United States and 51 unmanned aerial vehicles;
      ▪️ Operational-tactical aviation, drones, missile forces, and artillery groups of the Russian Armed Forces destroyed two Ukrainian Air Force MiG-29 aircraft, a P-18 air target detection and tracking radar station at the deployment airfield, and inflicted damage on weapons and ammunition depots, as well as enemy personnel and military equipment in 127 areas.
      ⭕ ❗️One person was killed and 13 were injured in the Kursk region on Tuesday as a result of heavy shelling from Ukraine, the acting head of the region reports
      ⭕ 📹 The Ukrainian Armed Forces employed ATACMS cluster missiles, with a range of up to 300 kilometers, to target and damage the civilian infrastructure of Lugansk for the first time
      ⭕ 🇯🇵 Japan сommemorates Hiroshima bombing without addressing responsibility

      Japanese Prime Minister Fumio Kishida acknowledged that the atomic bomb caused the deaths of over 100,000 people but did not specify who was responsible for dropping it. Instead, he highlighted Russia’s alleged nuclear threats.

      Moreover, Hiroshima Mayor Kazumi Matsui condemned the ongoing arms race, focusing his remarks on the conflicts in Ukraine and the Middle East.

      In addition, Hiroshima Governor Hidehiko Yuzaki also chose not to mention the US but emphasized that no weapon, once created, can be guaranteed not to be used.

      In August 1945, American pilots dropped atomic bombs on the cities of Hiroshima and Nagasaki. The explosions and their aftermath resulted in the deaths of 140,000 people in Hiroshima and 74,000 in Nagasaki.

      💠 @ejmalrai:
      ⭕ Hezbollah’s targetting the headquarters of the Golani Brigade and the Eggoz Unit has nothing to do with the retaliation of Israel’s bombing of #Beirut suburb.

      You still have to wait for a more significant response and deeper into Israel’s occupied territories

      💠@Seyed Mohammad Marandi:
      ⭕ As we slept last night, the Western backed Nazi holocaust continued.
      ⭕ Retweet:
      Israel is GANG RAPING Palestinians and subjecting them to GENITAL ELECTROCUTIONS, among other acts of depraved torture, according to the UN.

      WHERE IS THE OUTRAGE?

      ARE THERE ANY LIMITS TO THIS BARBARISM??? |media|
      ⭕ A very good reason why Iran must hit the Zionist regime very hard in order to establish permanent deterrence.

      The criminal US regime will allow and facilitate this monstrous entity to carry out any crime, anywhere, and at any time. |media|

    • #37863
      AHH
      Blocked

      Nasrallah started another speech. Dunno why and for what topic. Talk time is over

      💠@Seyed Mohammad Marandi:
      ⭕ Retweet:
      ‼️ Israel is holding thousands of Palestinians, including children, in TORTURE CAMPS, where the UN says they are subjected to the following:

      – Gang rape
      – Genital electrocution
      – Suspension from ceilings
      – Tied to beds blindfolded and in diapers
      – Stripped naked
      – Attacks by dogs
      – Waterboarding
      – Blackmail
      – Cigarette burns
      – Loud music played until their ears bleed
      – Deprived of adequate healthcare, food, water and sleep

      AGAIN, WHERE IS THE OUTRAGE????
      ⭕ This is not #Gaza.

      The Western backed genocidal regime murdered a 15 year old child in a drone strike on a vehicle in the occupied West Bank city of Jenin.

      Zionism is the great evil of our era.
      ⭕ Retweet:
      Statement from Saudi Arabia:

      “We will not allow a foreign object to pass through our territory, we are defending ourselves and not Israel.”

      Aka we’re defending Israel.
      [but foreign objects can pass southwards to bomb their neighbor Yemen…]
      ⭕ Retweet from Richard Medhurst:
      Confirmed. At least 2 US occupation troops killed at Ayn al Assad. [last night]

      The Americans would do best to leave Iraq. They are not welcome.
      ⭕ These are the crimes of the collective West. 🔞🔞🔞 |media| 🔞🔞🔞
      ⭕ “Israel, deeply divided over how to treat Palestinian prisoners.”

      This is how the @BBC frames the real debate among Zionists:

      “Should the subhuman Palestinians be raped and tortured or just tortured?”
      ⭕ EU, British, and Canadian regimes are just as satanic as the Zionist regime. |media|
      ⭕ The conflict has already escalated. The Zionist regime has bombed civilians targets in Beirut and Al Hudaydah alongside the assassination in Tehran.

      US aggression will end with the expulsion of the US from the Persian Gulf and the destruction of those regimes hosting US troops. |media|
      [note the concluding thought carefully. I would not be surprised if the main motivation of Egypt, KSA and UAE joining the BRICS was precisely to save themselves from the coming holocaust under way now. They had advance notice most arabs would be killed to make lebensraum for “Erez Israel.” They knew the Resistance would obliterate them during the process. They rushed to hunker under the skirts of Russia-China, hoping this could save them…]

      💠@Middle East Spectator:
      ⭕ U.S. CENTCOM Commander, General Michael Kurilla: ‘The United States cares deeply about its national security, and perhaps even more about Israel’s security’
      ⭕ Dozens of ultra-Orthodox broke into the Tel HaShomer army recruitment base in protest of their draft notices – Haaretz
      ⭕ Iran denies reports of arrests after the assassination of Hamas leader Ismael Haniyeh; there were no ‘traitors’ internally

    • #37872
      AHH
      Blocked

      💠 In November and December of 2023, the Nonproliferation Policy Education Center (NPEC), based in Arlington, Virginia, ran a wargame the results of which directly challenged assumptions about Israel’s nuclear weapons policy and when they might or might not use them. “For decades, most security analysts assumed Israel’s undeclared nuclear weapons were only deployed to deter attacks and that Iran would not dare to attack Israel directly,” Henry Sokolski, NPEC executive director, wrote in a report published by Bulletin of the Atomic Scientists on Feb. 27, 2024.

      He gave his report the headline, “Wargame Simulated a Conflict between Israel and Iran: It Quickly Went Nuclear.”

      “This after-action report describes a war game originally designed nearly two years ago. It directly challenges these assumptions and suggests that military strikes between Israel and Iran—including nuclear ones—are possible.” The 35 participants in the wargame included Republican and Democratic Hill staff; U.S. Executive Branch officials and analysts; leading academic scholars; national security and Middle Eastern think tank experts; and U.S. military personnel.

      The scenario of the war game involves an Israeli decision to target Iran’s nuclear program after detecting signs that Iran has begun mating nuclear warheads to missiles. Israel decides initially to strike Iran using conventionally-armed hypersonic weapons provided by the U.S., but these fail to have the desired effect. After a series of devastating strikes by both sides, and including Hezbollah, and tepid support from the U.S., Israel decides it has no choice but to launch a nuclear barrage of 50 warheads against 25 Iranian military targets (including Russian-manned air defense sites).

      “The aim is to cripple Iranian offensive forces and perhaps induce enough chaos to prompt the Iranian revolutionary regime to collapse,” Sokolski reports. “Almost immediately after the Israeli strike, however, Iran launches a nuclear attack of its own against an Israeli air base where American military are present.” The game ended at that point, but left a host of unanswered questions.

      “The strategic uncertainties generated after an Israeli-Iranian nuclear exchange are likely to be at least as fraught as any that might arise before such a clash,” Sokolski continues. “An unspoken hope among security experts is that nuclear deterrence can work between Israel and Iran. Such optimism, however, discourages clear thinking about what might happen if deterrence fails and both countries use nuclear weapons.” During the game’s play and discussions that followed, “participants emphasized how difficult it was to develop appropriate policy responses to Israeli or Iranian nuclear use as neither contingency was adequately considered before use.”

      Sokolski, along with two co-authors, had published an op-ed in the Washington Post a week earlier in which they called for an end to U.S. secrecy regarding Israel’s nuclear program. “One of the best ways to clarify these matters is for American and Israeli experts and officials to peek into the future by gaming different nuclear war scenarios,” Sokolski and his co-authors wrote in the op-ed.

      “Considering the strategic risks and uncertainties that a possible nuclear exchange between Israel and Iran revealed in this game, the formulation of proportionate military, political, and economic policies to deter nuclear use appears crucial,” Sokolski concludes in his after-action report. “This requires gaming and careful planning—both efforts that the United States’ outdated policy toward Israel nuclear-related classification all but precludes.”

      Though months have passed since the war game and the after-action report, the matter of Israel’s nuclear arsenal is perhaps even more relevant now than it was then, particularly when Israeli Prime Minister Benjamin Netanyahu is trying to drag the U.S. into a war with Iran.

    • #37875
      emersonreturn
      Participant

      “…they’re richer than all of us!”

      &, because of them, we are richer, beyond our wildest dreams.🕊️

    • #37878
      cronetoo
      Participant

      AHH, with regard to comment #37872 …

      … the simulated war games ‘isreal’ v Iran …

      it’s my understanding (from following Smoothie’s blog) that the USA does NOT yet have ‘hypersonic’ weapons.  I welcome evidence to the contrary 😉  of course.

       

    • #37882
      AHH
      Blocked

      Yes crone I agree. These Bulletin of Atomic Scientists were debunked long ago by Mr P and me, as remade political hacks, far from their origins. That being said, even Smoothie says all ballistic missiles are hypersonic (at end phase??). So the Empire of Lies engages in wordsmithery. True hypersonics are maneuverable at all/most points of their flight. Only 2-3 countries, all linked to Russia, appear to qualify for now

      ~~~~

      LOL. Hamas announced their new Politburo chief.. Yahya Sinwar – currently underground in Gaza. The antithesis of the last assassinated man! Haniyeh had been considered too accommodating and tilted too much to the compradore arabs/Turkey. Not so for the new Boss.

      This is like murdering Putin only to get not even Medvedev as the next Prez, but a resurrected Stalin who remembers everything! iirc, this is another prophecy being fulfilled — even after the majority arabs are massacred by Pax Judaica, the Resistance will remain to torment them, fiercely and resiliently, like Cuba right off the armpit of the former hegemon all these years. Thus does the Lord humiliate the Arrogant, even at their apogee, with Signs of the puniest who shall bury them

      💠 @Fotros Resistance:
      ⭕ JUST IN: Hamas has appointed Yahya Sinwar as its next political bureau chief, after the assassination of Haniyeh.

      The appointment was celebrated Al-Quds by simultaneously firing rockets at Askalan & Sderot just now (not related; just for the coincidence)
      ⭕️ Israel & the Americans tought they won, but they just dug their own graves, even deeper. |media|

      💠 @Middle East Spectator:
      ⭕ EasyJet announces it will not resume flights to Israel until at least March 2025
      ⭕ The Jerusalem Post’s report about Pakistan’s intention to supply arms, especially missiles, to Iran, is false.
      [The last thing Iran or the local resistance need are missiles. Air defense, EW, ISR, (GLONASS guidance kits?) appear the priorities. Iran has a problem finding storage for all their missiles and drones! This has allowed them to earn a pretty buck selling to Russia and to others..]

    • #37883
      cronetoo
      Participant

      Davis is not very informed, is he?

      Thank goodness Freeman is …

    • #37887
      AHH
      Blocked

      I think Col Davis is starting to understand what’s going on.. he’s a hard worker, learns, and is discarding decades of mindwashing and groupthink. The breeze of the Apocalypse blows away alotta brain fog! And some is clearly an affectation many excellent interviewers use to elicit dialogue with their guests — like Nima, another sharp humble cookie. Seeming naïveté encourages deeper discussion and answers. I like Davis most among all the military guys – a grounded Southerner, who’s horrified to learn now in retirement that’s he’s a Black Hat. He even let slip once, “we’re not the good guys..” They can face the bitter Truth in the South.. a deep sense of betrayal and shame, and understanding they served criminals as bouncers of Empire. Gaza is the world’s mirror


      ☝️ i think this is an excerpt from his video from yesterday, not today. Ain Al Assad base in Iraq wasn’t struck again today..

      💠 @Middle East Spectator:
      ⭕ Israeli authorities blocking Palestinians’ access to healthcare in West Bank
      [The arrogance of zionazi jews is astounding. They could be minutes from being annihilated. They still work to genocide the sea of enemies around them]
      ⭕ Some info on Hamas’s new politburo leader, Yahya Sinwar:

      – He was born in the Khan Younis refugee camp in Gaza in 1962.

      – His family were refugees from Majdal Askalan, or what became Ashkelon, after the creation of Israel in 1948.

      – Sinwar has spent 22 years of his life in Israeli prisons for allegedly planning the abduction and killing of two Israeli soldiers in 1988.

      – An Israeli government assessment of his years in detention described him as ruthless and powerful.

      – He used his time in jail to become fluent in Hebrew.

      – In 2017, Sinwar succeeded Haniyeh as Hamas’s leader in Gaza.

      – After the October 7 attacks, the Israeli military described him as a ‘dead man walking’, and as the ‘most radical man inside Hamas’.

      💠 @Hamas/Tsahal:
      ⭕ After five Israeli soldiers were injured this morning in the Gaza Strip, two of them in serious condition, the army announced that it had temporarily closed the road leading from the Kerem Shalom border crossing to the humanitarian zone in the Gaza Strip. [This was the last lifeline to food and supplies from the outside world. It reportedly admitted less than 50 trucks in July. Palestinians calculated ~ 1,000 trucks/d were needed in north Gaza alone several months ago, when the famine set in]
      ⭕ Over the past 48 hours, CENTCOM reported the interception of five Houthi unmanned aerial systems (UAS), three anti-ship ballistic missiles, and one unmanned surface vessel (USV).
      [Ah, Yemenis welcomed back the US Navy to the Red Sea with the fondest of greetings. A new cadre arrived to be doled PTSD.. Stay alert, lads! This is the appetizer, and the best case scenario]

    • #37888
      Mr P
      Participant

      About hypersonic. Remarks. Somewhat conjectural.

      There is a calculus accounting shape (drag coefficient and area) mass density, initial kinetic energy (how much energy was imparted in by the launcher), pathway (how long the machine experiences drag and the rate of increase in drag as the air density increases with loss of altitude. To stay hypersonic it needs to be very dense – (like mostly tungsten (I’d guess)), These are pretty basic aerodynamic calculations, and the engineering demands some very exotic materials – but indeed just about any streamline shape with significant mass density goes hypersonic if it falls out of sub orbital or orbital pathways, if it doesn’t melt or disintegrate from stress. And even at low altitudes with plenty of rocket boost a projectile can go hypersonic – some rifle bullets are hypersonic…(in a sense the bullet is escaping the “rocket” – the rifle, which accelerates into the shooter’s shoulder) and there are laboratory “cannons” that make little things go extremely fast. Lesser but significant are variations in tidal forces and gravity…so called  coriliosis effects – then there’s the big problem of control, guidance –  The air around the machine gets very hot, so hot that it conducts electricity – vaguely like the tenuous gas in a fluorescent lamp or the old radio tubes do. This is nice for a weapon designer, as it makes the thing essentially radar-proof – invisible to radar. But it means that the machine is more or less blind to radio input. How the Russian, Chinese, Iranians systems of guidance work is a big secret…my guess is optical-celestial (some portion of the light spectrum is transparent, as a “window” looking up from the doral portion of the machine. combined with inertial guidance – which measures and integrates acceleration and attitude and altitude with time – running through very sexy algorithms…the interim conclusions would be combined with celestial – optical ie the machine looks at the sky.  The second big problem is how to change direction and control angles of attack in the atmosphere. No one is saying anything about this. I can imagine two. One is gas bleeds through tiny lateral ports – changing the local drag very slightly according to the guidance algorhythm. Another possibility is changing the center of mass – in the atmosphere the machine is expending energy, slowing. Imagine a heavy slug  inside that can move in two lateral directions by servos motors – change in yaw and pitch would occur. My guess is that both methods are combined.

      Additional at terminal phase, ie the last few kilometers, a machine might well fire a small rocket engine to add to its final velocity. “Velocity” here is slightly incorrect, by the way, maneuvering objects have speed, not velocity – unless they’re not maneuvering – then the speed is equal to the velocity. Imagine a car going 100 mph at Bonneville Salt Flats – the speed and the velocity are the same. But let the car do 100 MPH at a Indianapolis and the speed in 100, the velocity is constantly changing. Mostly these two words are used interchangeably.  But they matter, sometimes, a lot. It takes energy to change velocity. Speed, ignoring friction, does not.

      Mind you, some of what I’ve written is highly conjectural. I have been thinking about the hypersonic problems for years. But Werner’s Ghost does not answer my dreams. 😉

       

      • #37894
        amarynth
        Keymaster

        This Postol guy was speaking about that with Mercouris and Glenn Diesen.  I did not understand a word but he had charts to explain the hypersonic thing.

        • #37895
          Mr P
          Participant

          It was a long interview, but I watched it. FWIW I completely agreed… I had not known about the technical difficulties involved with the imaging of and differentiating the rocket launches from other IR signals. It was fascinating.  Taken as a couple, the basic elements being Russia and the US, imho it amounts to a “machine” that so long as it’s running is a doomsday machine that’s already triggered, and will go off if it runs long enough. That can happen at any time. The machine can be taken apart – disconnected by political choice, or destroyed by a coronal mass ejection that hits the earth hard enough and burns the orbiting parts, or maybe by a comet strike that’s big enough. Imagine a bucket of nitro-glycerin on the stove, heating slowly…only on a global scale.

    • #37892
      Mr P
      Participant

      Redacted… with Larry Johnson... mentioning FF possibility an’ dead GI’s as a real possibility.

       

      • #37906
        AHH
        Blocked

        Sadly Mr P, I suspect the corn-fed lads are doomed. Indeed, they were likely doomed with the first UNSC veto, when the satanic trajectory was conclusively established. You can fool some of the people all the time, but.. not the civilizational-states at really any stage at this point. The risible game of “Zion plays bad cop, and USUK plays good cop” shall not stand. The criminal piratical cabal plays for time – to finish culling Palestinians and seed collapse through internal civil war in all regional countries through enforced governmental inaction. That window has now closed. Even the threat of nuclear war no longer works – because it is clear all regional countries are to get the Gaza treatment anyhow. With what more can one threaten a people???? So whining about FF and the risk of war expansion by attacking US troops is a waste of time and non-starter. The initiative has passed to the other side now. They are about to kill them, come hell or highwater. The western “experience” can be previewed in the 404 UkroNazi..  Every single one of those lads is already a goner, like the colonialists of Zion

        • #37911
          Mr P
          Participant

          Well, if so, and I can’t dispute it, then the happy result is that the doomsday machine will be disconnected. A military-technical SMO, so to say. Other results are not very happy though.

    • #37893
      cronetoo
      Participant

       

    • #37898
      manderson
      Participant

      Very interesting info RE hypersonics Mr P and Amarynth. I have always found it interesting that Andrei Martyanov says that Russia’s hypersonics are fully shoot and forget, which means that once they have received their target’s general area, they have active seeker capability, likely including imaging in some part of the spectrum to identify the target in the general area of the coordinates given at launch (e.g., by image correlation, which is how the houthis do some of their drone targeting).

    • #37899
      manderson
      Participant

      Also martyanov has some thoughts on Ted Postol’s strategic ideas on ballistic missiles if you search his blog for “postol”. Here’s one. https://smoothiex12.blogspot.com/2024/06/responding-to-ted-postols-thesis.html

      Still Postol provides a useful US perspective on the issue.

      • #37921
        Mr P
        Participant

        I think Martanov actually confirms Postal’s most basic argument. That was/is that the people in the US believe that they can do a first strike and get away with it. That they themselves are in “group-think, and must be in that state in order to “advance” in their jobs. That this belief is delusional is the fundamental problem. I had some doubts about Postal’s claim that Ruskie was unable to see US launches, as I noticed he did not mention OTH radar or the likelihood of additional satellites. What seems, probably is, true, is that the couple, the pair of machine elements of Rus and US forms a doomsday machine. If the US were to act upon their delusions as to Ruskie capabilities by launching many missiles, we might hope that Ruskie holds off on counter-fire. Slim hope. Some US missiles would almost surely hit their targets in Russia…after that reprisal would almost certainly take place. Doomsday? They say that about 100 bombs would kill most people on earth, most from starvation due to the smoke from burning targets. In the assumed “exchange” 100 seems like a low number.

        OTH radar, by the way, was the first radar ever used. First noticed in the form of radio echos from ships at a distance over the horizon – a surprise in US fleet exercises in the 1920-1930 period, and in WW2 by the UK “Chain Home” system. Chain Home could see V2 launches in Europe, and vector bombers to attack the V2 launch sites in a very short time. That made it necessary to make the V2 launch system mobile. Modern signal processing makes OTH pretty accurate. It depends on ionization of the upper atmosphere, and that waves around and varies constantly, even going away sometimes with Earth magnet field variations, solar conditions create the ionosphere in interaction with the magnetic field. My view that a CME can disarm the doomsday machine, is not changed, that and “ground-based” 😉 affairs, ie political-technical matters may actually shut the machine off in time.

        I did some recent exploration of the character of “group delusions” and the holders of false histories and beliefs, of what Postal called “group-think”. It is highly obdurate. Almost impenetrable. In “adults” anyway. In kids it’s probably somewhat plastic.

        I had missed, skipped, Martanov’s reply to Postal. Actually I wasn’t going to bother with Postal at all, until AHH suggested it. Thanks to both of you. Quite an excursion!

        • #37956
          manderson
          Participant

          True, I think Postol and martyanov agree on the state of US elites doing strategy. And I agree with you, the miscalculation thinking the Russians do not see launches at sea when they actually can is very very dangerous. martyanov did his thesis on ASW so he’d know. Based on Martyanov’s blog, it seems he communicates with postol, so some professional disagreement. I would think that OTH radar is preferable and more defendable than satellites anyway.

    • #37908
      AHH
      Blocked

      💠@Strategika51:
      ⭕ Resistance operations in Gaza.

      The military wing of the Palestinian Hamas continues to grow stronger and more powerful, despite 11 months of high-intensity, asymmetrical conflict in which Israel and its allies have dispensed with all the contingencies of the laws of war.

      It seems that the movement, which was not popular before the war, has become by force of circumstance the only possible hope for tens of thousands of people whose families and loved ones have been massacred.

      The video is interesting in more ways than one, as it shows the headquarters of one of the Rafah brigades, which appears not only intact but in control of the terrain despite a clear lack of resources.

      There’s a maxim that’s just been born in the Gaza Strip, and which everyone is repeating: “for decades we were led to believe that it took armies from dozens of countries to fight Israel, and now we discover that a handful of men have shaken this paper tiger“. |media|
      ⭕ China continues to develop a system similar to the American Starlink satellite data transmission system.

      The first 18 satellites of the Chinese system have already been put into orbit.

      The Chinese system is less expensive and reportedly performs better than Starlink.

      Elon Musk is not going to be happy.
      [these starlinks were supposed to take over after total chaos on earth severed land communications, whether due to wars, cut subsea cables, folks scavenging for copper wiring as already rife in USA, downing of most grids, etc.. and a way to remote-control mankind even once the Sea Pirates were rolled back, off the world-island. However all this appears moot now, with Armageddon rolling out. The skies shall be blasted too — then which constellations can stand??]
      ⭕ War in the Middle East:

      Israel has eliminated Ismael Haniyeh, a moderate from the outside, only to find itself facing Yahia Al-Sinwar, not only its most determined, systematic, consistent and hard-line enemy, but also, without a doubt, the best Palestinian strategist of all time. Those who ordered Haniyeh’s assassination should have raised the white flag and started a general evacuation of the Israeli population towards western Ukraine 🇺🇦 and southern Argentina 🇦🇷, because what they’ve just had as a result is even worse than all their worst nightmares ☠️…
      ⭕ Life is always strange. Yahia Al-Sinwar was sentenced to life imprisonment in 1989 for his role as “judge” in the death sentences handed down to four Palestinian informers for Israel’s security services.

      He was released in 2011 as part of an exchange of Palestinian prisoners for Israeli soldier Gilad Shalit.

      With a degree in Arabic literature, this poor child from Khan Younes learned Hebrew in prison and distinguished himself by his assiduous daily reading of the entire Israeli press.

      It was in prison that he fell ill and lost his sight due to a tumor in his brain. He underwent brain surgery in Suruka, and after his operation the prison authorities reminded him that he owed his life to the State of Israel. Israeli officials tried in vain to lure him (“he could be one of us”) and to grant him Israeli nationality. All to no avail. On his release from prison, Al-Sinwar resumed his activities. He would say that he no longer felt like fighting, and that the Gaza Strip could easily resemble Singapore or Dubai. In effect, Al-Sinwar replaced Haniyé in the Gaza Strip and appeared to the Israelis as someone concerned with the socio-economic aspects of the Strip. The Israelis concluded that Gaza was no longer a priority or a threat, and that they should focus on the Syrian and Iranian threats. This was a fatal mistake.
      [what a beautiful maskirovka! His miraculous life story reminds of Moses – raised in the very palaces of Pharaoh…. more Signs]

      💠@Middle East Spectator:
      ⭕ Something has apparently caught fire off Naqoura town in the open sea in Mediterranean.

      📝It’s interesting to note that Karish natural gas field which the IDF announced twice that it’s intercepted 2 drones over the past few weeks trying to target it, is located off Naqora as shown in the picture.

      It could also be just some flares fired by the IDF.
      [“Got Energy?”]
      ⭕ Yahya Sinwar.
      [He said this years ago. The coming treachery of the compradore zionist arabs was well known, and accounted for in ongoing calculations. The expected Genocide in Gaza built the moral ground and justification for what comes now; perhaps the Jordanian pig went bug-eyed for a good reason! Beautiful days ahead, heralding the destruction of demented little Zion and all their hangeron condoms. They are joined in totalen krieg. Greater Syria in alliance with Iran and Yemen are sufficient. They have the wisdom, courage, resolve, arms and numbers – and shall triumph]

    • #37913
      Mr P
      Participant

      Intel Slava Z
      🇷🇺 ⚡️President Vladimir Putin convenes the Russian Security Council at 13:00…

      The main theme, I think, is clear.

    • #37918
      Mr P
      Participant

      О новых деталях и экономических последствиях подрыва “Северных потоков”

      On the destruction of the  gas pipes under the sea…how it was done. Who did it.

      New details and economic consequences of the Nord Stream disruption

    • #37919
      Mr P
      Participant

      https://theduran.locals.com/post/5966631/the-war-the-neocons-have-been-looking-for-twelve-us-air-force-f-22a-raptor-fifth-generation-fighter   (sorry about the possible difficulty due to locals)

      The airplanes are said to be 12 machines of F22 types at RAF Lakenheath air base UK, and going to to “Middle East”. These are pretty sexy flying machines. Not a defensive machine, a “stealthy” attack machine, ie possibly the sort of machine one might use in a sneak attack. Not that anybody will be ‘sprised.

      …….

      I have heard it said that Speaker Johnson has said that “if Iran attacks Israel the US will declare war on Iran”… Geewhiz, sorta let the kittly outada bag there ol’ pal, speaking of attack type flying machines. Only Congress can declare war. Not that it matters to them what the Constitution says, or any other law. What a bunch! Bombs away boys…and then what? Bombing never wins any war, cannons and infantry do…or sticks and stones.

    • #37925
      AHH
      Blocked

      💠 @Middle East Spectator:
      ⭕ — 🇸🇾 NEW: Syrian tribal forces backed by the Assad government, have mounted an assault along the Euphrates river in Deir Ezzor province; the cities of Al Busayrah, Diban, and the outskirts of Abu Hammam have been captured

      The US-backed SDF Kurds are bringing in reinforcements to stop the advance. The Assad-backed tribal troops are approaching the US base in Al-Omar oilfield, known as the ‘Green Village’.
      [This is huge. All fronts are detonating against the Last Satanic Empire. Remember, the entire reason USUK squats on Syraq is to help birth Greater Israel. Not to steal some oil, per the inveterate liar Trump. They just sent US reinforcements to Al-Omar oilfield, and the Kurds in last days released over a thousand “jailed” ISIS for just this rainy day. Syria is going live again]
      ⭕ — 🇸🇾 NEW: The Assad-backed Syrian Tribal Forces raise their flag over Busayrah

      💠 🌎🛡GEOPOL360🕊🌍:
      ⭕ 🇸🇾 Syria: The revolt of Arab tribes against Kurdish Rojava continues.

      Arab tribes in Deir ez-Zor province have taken control of several localities in the same province, such as Abu Hamam, Al-Latwa, etc.

      The SDF (Syrian Democratic Forces = Rojava) often accuse Turkey and the Syrian authorities of supporting Arab tribes in the region.

      Arab tribes accuse Rojava of anti-Arab discrimination and refuse forced conscription to fight against the Turkish army in the north, outside their province. [the Kurds made their bed. They’re going down with USUK & ISIS]

      💠 @Fotros Resistance:
      ⭕ Major developments in Syria: It’s time the US occupation of Al-Omar oil field ends.
      ⭕ Do you know the story behind this iconic photo?

      On May 16, 2021, the Israeli regime bombed Yahya Sinwar’s house in Khan Yunis [Gaza], intending to assassinate him. Hebrew media confidently reported that the mission had succeeded and that they had eliminated the Hamas field commander.

      But just a few days later, Yahya Sinwar reappeared at the bombed site, took a pose on his own couch and took this photo.

      This unexpected act made various factions of the Israeli regime very furious. Sinwar effectively mocked the Israeli army and intelligence embarrassing them effectively 🙂

      💠 @Strategika51:
      ⭕ Declassified Russian archives reveal that Hitler had planned to use the atomic bomb against the USSR in June 1945.

      Germany had surrendered on May 08, 1945, and the secrets of the atomic bomb, known since the 1930s, were disclosed to the Allies as early as 1938.

      The Allies gave priority to bombing all resource areas used in the German nuclear effort.
      ⭕️ 12 of the US Air Force’s 5th generation F-22A Raptor fighter jets have arrived at Lakenheath Air Base, UK, for deployment to the Middle East.  |media|
      ⭕ Iran 🇮🇷: deployment of air defense systems in the east of the country. This is a first. In general, Iran’s air defenses are denser in the west and north of the country.

      The decision to deploy air defense systems to the east of the country (on the borders with Afghanistan and Pakistan) seems to respond to scenarios involving possible US attacks from Pakistan.
      ⭕ The United States 🇺🇸, Great Britain 🇬🇧, Australia 🇦🇺, France 🇫🇷 and Italy 🇮🇹 officially boycott the commemoration ceremony for the atomic bombings of Hiroshima 🇯🇵 and Nagasaki 🇯🇵 and the tribute to the death of the atomic bomb, because the Israeli ambassador has not been invited by the mayors of Hiroshima and Nagasaki.

      To date, the United States is the only country in the world to have used atomic weapons against civilian populations in wartime. They have no regrets whatsoever.

      Their “follower” vassals contradict all the values ​​they have publicly defended for decades, and are complicit in the horrors committed in Hiroshima and Nagasaki on August 06 and 09, 1945. The Mayor of Nagasaki stated that the Japanese victims of the atomic bomb will remember that barbarians always stand together and never regret their crimes.
      ⭕ War in Ukraine:

      The entire 22nd Ukrainian brigade has penetrated the Russian oblast of Kursk.

      The Russian air force is trying to slow its advance while awaiting reinforcements.

      It seems that Russia’s borders were totally defenseless in the face of an enemy country…
      ⭕ Russia🇷🇺: The governor of Kursk and many other military leaders are going to be blown up…

      This level of carelessness is almost deliberate.
      ⭕ What will happen when F-16s provide CAS (Close Air Support) to Ukrainian forces on Russian territory?
      [They won’t make it there. But it is careless to allow this stunt to take place at all. Leave the meat grinders in 404!]
      ⭕ Vladimir Putin can no longer speak of a Special Military Operation.

      He will be forced to declare war because Russian territory is now invaded.
      ⭕ Before his disappearance on April 30, 1945, former German Reich Chancellor Adolf Hitler knew that the world would become polarized around a conflict between the USA and the USSR.

      He also knew that rockets, the jet engine and the atomic bomb would revolutionize the post-war world.

      Finally, he was ironic about the end of the British and French colonial empires right up to the last moment.
      ⭕ ⚠️Currently undergoing an emergency meeting of the Russian National Security Council.
      ⭕ Britain’s riot experiment aims for the end of social networks as accounts and “influencers” are accused of using misinformation to provoke scenes of violence.

      The turn of the screw is coming.

      The agent provocateur behind the riots has fled the country for Israel.
      ⭕ Syrian army’s first reported offensive since 2015. Details to follow.
      [As i said, DETONATION. Syria went live again, the civilizational-states’ riposte is underway against irredeemable Barbarism. To the last USUK]
      ⭕ The Pentagon believes that Iran will do nothing after the formidable show of force, virtually unprecedented in US military history in the Middle East.
      [Degenerate imbeciles. They shall learn, for the last time]
      ⭕ The Venezuelan president uninstalled Meta’s WhatsApp application from his phone live on TV, calling it an extreme danger to everyone.

      He called on officials, military leaders and the population to do the same, in order to deprive the imperialist enemy of one of its most formidable weapons.

    • #37945
      AHH
      Blocked

      💠 @Sputnik Africa:
      ⭕ 📌 Sputnik Africa brings you a recap of world news by the morning of August 7:
      🔸 Niger immediately severed diplomatic relations with Ukraine due to its aggression against Mali, reported a representative of the transitional council;
      🔸 Russian air defense forces destroyed and intercepted 11 Ukrainian drones overnight over the Belgorod, Kursk, Voronezh, and Rostov regions, the Russian Ministry of Defense reported;
      🔸 Russian and Indonesian sailors will conduct the first-ever bilateral exercises in Java on November 4-8, announced the Commander of the Indonesian Armed Forces.

      💠 @Strategika51:
      ⭕ Several localities on the Euphrates invested by Syrian army-backed tribal forces against Washington-backed Kurdish militias.

      US attack helicopters are trying to slow down the tribal forces with rotative cannons and rockets.

      💠 @ejmalrai:
      ⭕ Footage is released of Israeli soldiers covering themselves with shields, as they rape a Palestinian hostage at the Sde Teiman torture camp.
      The unnamed hostage was hospitalized with a torn rectum, broken ribs, ruptured bowels & damaged lungs |media|
      [“Western values” to die for.. they’re exiting the stage of history like Sodom & Gomorrah, in proud orgiastic ecstasy]
      ⭕ Israel’s arm is long, but the rest of its body is now trembling, waiting to run to the nearest shelter. What is the point of violating another country’s sovereignty when you, @netanyahu, r spending billions to minimise the impact of the war & begging the #US & NATO for help? Is that a “long arm” or a brain-dead one?
      ⭕ Always remember:

      Without #US and #German ammunition, #Israel won’t wage war or expand its wars to other countries in the Middle East.
      [Divine Judgment won’t forget either, and not deferred for long per tempo of events]
      ⭕ It is highly significant that the Hamas leadership in #Syria has chosen Yahya al-Sinuar to replace Ismail Haniyeh as head of the #Hamas political bureau, following a wide consultation with Hamas leadership in different parts of the ME.
      This is a double message to #Israel about Syria’s role.
      [You can kill men, but not the idea, especially when in the hearts of BILLIONS. Palestinians, and Great Syrians overall, are merely the tip of the spear. As the AntiChrist and his little trumpet are the opposing tip]

      💠 @imetatronink:
      ⭕ The ruling juntas in the so-called “western democracies” are pleased by the normalization and legitimation of the Amalek Doctrine. They may encounter a need to employ it at some point in the not-so-distant future.
      ⭕ 🤔 I am increasingly inclined to believe the Iranians are deliberately trying to provoke the Israelis to launch a preemptive strike against them.

      If so, I consider it an impressively cunning plan.

      Both Israel and the US are teetering on the razor’s edge of tension
      ⭕ ‼️ Ship of Fools

      The imbeciles at the empire’s helm have begun to perceive they have awakened a resurgence of three great civilizational powers — banded together to defeat imperial hegemony.

      America’s statesmen are dunces; its military debilitated.

      This is how empire’s end.

      💠 @Strategika51:
      ⭕ Russian President Vladimir Putin holds an emergency meeting on the situation in the Kursk region, attended by Chief of the General Staff Valery Gerasimov, Defense Minister Andrei Belousov, FSB Chief Alexander Bortnikov and Security Council Secretary Sergei Shoigu.
      ⭕ The US State Department is offering a $10 million cash reward to anyone who can provide information on the CyberAvengers hacker group.

      The US State Department is using 79 groups of professional hackers to track down this group accused of having links to Iran and of causing irreversible damage to highly sensitive cyber infrastructures in the USA.
      ⭕ There will be no remake of the Battle of Kursk (July 05-August 23, 1943).

      The Ukrainians have thrown in some equipment and a few disposable young soldiers for a public relations exercise aimed at Russian gas export capabilities.

      This Ukrainian war is unlike any other. It’s like a slow-motion, upside-down boxing match…

      💠 @Intel Slava Z:
      ⭕ 🇺🇸🇺🇦”The United States intends to request clarification from Kiev regarding the events in the Kursk region” – White House
      [Reportedly Anglo-French nazis on tanks and US SOF doing recon… “Charge!”]
      ⭕ 🇷🇺🇺🇦Large forces of the Russian Armed Forces entered the Kursk region. Now the Ukrainian Armed Forces need to run back or die in foreign lands

      💠 @DDGeopolitics:
      ⭕ 🇺🇸🇬🇧🇾🇪 US-UK aggression targets with two airstrikes the governerate of Ta’izz South of Yemen.
      [Late last night]
      ⭕ ❗️Chechen General Apti Alaudinov response to the failed Ukrainian attack on the Kursk border. 💪🇷🇺

      🍿🇺🇦”The Ukrainians are throwing their last reserves into battle. Take out some popcorn and enjoy watching us crush them.”
      ⭕ 🇪🇺🇺🇦🇷🇺 Amid concerns about transit through Ukraine, gas prices in Europe have reached $435 per thousand cubic meters for the first time since December, rising by 5%. [move to warm Yemen or Madagascar!]
      ⭕ 🇷🇺⚔️🇺🇦 Report from the Chief of General Staff to the President

      The advance of the Ukrainian Armed Forces into Russian territory has been halted, reported General Gerasimov at a meeting with Putin.

      Currently, units of the “North” military group and FSB border guards are destroying the enemy in areas near the state border;

      The enemy lost 315 people, including 100 killed, as well as 54 pieces of armored equipment, including 7 tanks;

      The operation in the Kursk region will be completed with the defeat of the enemy and the reestablishment of the state border.
      ⭕ 🇷🇺⚔️🏁 Ukrainian channel RezidentUA writes:

      “Our source in the Office of the President revealed that Andriy Yermak coordinated with the U.S. for the Ukrainian Armed Forces to attack the Kursk region as the first stage of the Ukrainian army’s counteroffensive.

      NATO military advisors participated in planning the General Staff’s operation, and British intelligence helped organize the attack.”

    • #37946
      Mr P
      Participant

      From the many above> “…the secrets of the atomic bomb, known since the 1930s, were disclosed to the Allies as early as 1938…”

      The general idea was patented by Szilard (UK patent) That’s true. After that it was still unclear how, even if, it was possible. Einstein thought it would be so big that only a steamship could carry one. More research revealed two potential materials, an isotope of plutonium, and an isotope of Uranium. Pu was unsuitable for a simple bomb, a “gun-type”, but U would work. (iirc there are actually two workable isotopes of U. After than almost everything was just engineering. The only real secret was that it could be done in a package small enough to move around, a “bomb”. Heisenberg was pretty sure, probably, how to do it. However the resources to do it were by that time unavailable to the Germans – it’s just too big a project with the ways of the 1940’s. The “secret” was made essentially public at Alamogordo, when that gadget worked.  Engineering details, like methods of isotope separation, reactor design for breeding Pu, designs of implosions devices…did matter, but leaked out almost immediately. Those secrets were ephemeral and actually almost trivial. Any bright educated bunch with plenty of resources could make these things within a few years.

    • #37949
      cronetoo
      Participant
      • #37957
        AHH
        Blocked

        Sadly crone, keeping in mind Göring’s famous remark on how to convince those universally under the elite thumb, and seeing the absolute ruthlessness and shamelessness in dragooning the hapless Ukies (another live test).. when the West imminently and proudly puts on the Black Hat, these polls shouldn’t matter much..

        “Why of course the people don’t want war. Why should some poor slob on a farm want to risk his life in a war when the best he can get out of it is to come back to his farm in one piece? Naturally the common people don’t want war neither in Russia, nor in England, nor for that matter in Germany. That is understood. But, after all, it is the leaders of the country who determine the policy and it is always a simple matter to drag the people along, whether it is a democracy, or a fascist dictatorship, or a parliament, or a communist dictatorship.

        Voice or no voice, the people can always be brought to the bidding of the leaders. That is easy. All you have to do is tell them they are being attacked, and denounce the peacemakers for lack of patriotism and exposing the country to danger. It works the same in any country.

        Hermann Goering”

    • #37958
      cronetoo
      Participant

      I agree AHH … just want to remind others that the so called ‘Christian’ nationalists do not have a majority here in the US …

       

    • #37959
      manderson
      Participant

      The MoonofAlabama highlights this piece by Tarik Cyril Amar. https://x.com/TarikCyrilAmar/status/1818580601219293405

      The thesis of which is:

      “Gaza is a Method. I intuitively agreed: It is obvious that the mass murder in Gaza outlines a pattern, a set of tools and measures of extermination, subjugation, and expulsion that are ready for export and will be in high demand – just like so much else of Israel’s spying, policing (if that is the word), and murder skills and tech have always been.”

      Only a matter of time before this is used in the West on its own citizens.

    • #37962
      AHH
      Blocked

      💠 @Middle East Spectator:
      ⭕ — 🇾🇪 NEW: Yemen’s Ansarullah announce two new operations; targeting the “Contship Ono” container ship, as well as U.S. Navy destroyers “USS Cole” and “USS Lassen”
      [This USS Cole is really unlucky. Second time being bombed in Yemeni waters. Apparently an own-goal the first time, since Al-CIAda performs strictly on command; and it took place mere months before 911 to sensitize the coming messianic mission and decades in the middle east to help the still ongoing birthing of the Moshiach]
      ⭕ — 🇺🇸/🇮🇶 Yesterday, U.S. troops were reportedly deployed in the K-1 base in Iraq’s Kirkuk for the first time since 2020.
      [More fat targets for Iran. Remember in January, Iran bombed a Kirkuk zionist rat’s nest next to or part of an unfinished US consulate, as retaliation for the mass bombing terrorism inside Iran]
      ⭕ The United States has warned Turkey of potential ‘consequences’ if it does not reduce military exports to Russia.
      ⭕ Israel’s Channel 12 in a poll:

      Do you agree that a soldier is allowed to rape a ‘terrorist’?

      47% Yes
      43% No

      💠 @Fotros Resistance:
      ⭕ Footage shows Arab tribes from Syria inside the Al-Omar oil field, which has been occupied by US-backed Forces, on the outskirts of the town of Dhiban  |media|  [WOW!!!! What a time the civilizational-states chose to reactivate Syria. Syria is the beating heart of Armageddon. The most important real estate on Earth…… Damascus will soon witness the Second Coming, and the end of five thousand years of the abomination of Babylonia]
      ⭕ The reason why the retaliation has not happened so far, in my opinion, is simple.

      The retaliatory strike is already set in stone, the response has not happened yet as Iran needs to prepare for an all out war and a bigger retaliation by israel as they have promised they’ll respond if Iran attacks.

      Obviously it’s easy to nag and complain behind your phone screens for Iran to attack, but we’re talking about millions of Iranians whose life will be in danger. So Iran has to make the necessary preparations and be ready in case a response comes from israel.

      So have patience and stop watching hollywood movies. =)
      ⭕ Chief Commander of the IRGC, Maj. General Salami, told the new political leader of Hamas, Yahya Sinwar, that his appointment has made Israel furious.

      He said the IRGC is ready to help the new chief of Hamas.

      💠 @Intel Slava Z:
      ⭕ 🇬🇧 TV hosts in the UK are discussing banning social media during periods of social unrest to curtail the spread of “inflammatory information” in order to “keep communities safe”.

      📝: You can tell the UK government has lost control of the events when they are talking about blocking all social media. Typically moves like this only work to further enflame tensions when people are already rioting in the streets. |media|
      ⭕ 🇪🇺🇺🇦🇷🇺EU not against actions of Ukrainian forces in Kursk region [of Russia proper], says European Commission External Action Service spokesman Stano
      ⭕ 🇺🇸🇺🇦🇷🇺⚡️The United States is in contact with Ukraine regarding military actions in the Kursk region, and considers Kiev’s foray to be its sovereign decision , the State Department said.
      ⭕ 🇺🇸🇺🇦🇷🇺⚡️Ukraine did not inform the United States in advance about its plan to attack Russian territory, The Wall Street Journal writes, citing American official sources.

      At the same time, as the publication writes, weapons supplied by the United States and Western countries are being used in the military operations on Russian territory.
      ⭕ 🇺🇸Ukraine’s actions in the Kursk region do not violate US restrictions on the use of American weapons supplied to Kiev (c) US State Department

      So shooting at cars with civilians from the Stryker armored personnel carrier too? In principle, we didn’t expect anything else from cannibals . [laugh now, cry later.. what goes around..]

      💠 @DDGeopolitics:
      ⭕ 🇷🇺⚔️🇺🇦 Ukrainian channel RezidentUA writes:

      MI6 has provided new intelligence to the Office of the President and the General Staff that the Russian army is redeploying five brigades and combat aviation to the Kursk region to form strike groups. According to British intelligence, the Kremlin has decided not only to clear Russian territories of Ukrainian forces but also to create a sanitary corridor in Ukrainian territory.
      [This stunt was expected. A useful ploy. A new front is being opened on Sumy, which the Ukies started evacuating the border towns. Patience pays off. 404 will lose all of 404, through unending terrorism and absolutely counterproductive Anglo-directed PR sabotage missions.]

      💠 @ejmalrai:
      ⭕ BreakingNews:

      Tired of waiting, psychologically exhausted by the lack of immediate retaliation from #Hezbollah and #Iran, and by the harsh domestic emergency measures imposed on the Israeli population, #Israeli PM @Netanyahu has ordered his air force to bomb Tel Aviv. 😇😇😇
      ⭕ The #US administration said (Last Monday) that #Iran would retaliate. I said no. Now, the US says it will be within 24-48 hours. I say no. The retaliation will come unexpectedly.

      Enjoy your peaceful weekend for those outside #Israel.

    • #37967
      Mr P
      Participant

      https://fpp.co.uk/books/VirusHouse/ (on the nazi bomb project, pretty good!)

      https://www.rt.com/russia/602290-hitler-planned-to-nuke-ussr/ (rather breathless, perhaps sensational)

      They worked on the thing, and of course intended to use it, but were unable to mount the necessary scope of industrial  project. For example, iirc, the Manhattan Project used about 10% of the total electrical capacity of the US, entire industries had to be built, new material (teflon, for example) had to be invented. They might have been able to build radiological “bombs” – but not a real atomic explosion. TNT was a more “profitable” way for them. Graphite is generally contaminated with boron, chemically quite similar to carbon, so they realised that rare isotope “heavy water” (3 hydrogens instead of two) was necessary. The UK destroyed the heavy water in a raid, and damaged the electrolysis plant in Norway by commando raid, later, iirc, by bombing from the air.

      The UK bomb project, Churchill’s ardent lust, was always for the USSR. The UK project transfered to the US when the Brits realised they themselves couldn’t do it. Hence it was a combined effort for the US and Canada and England, and very importantly, European expat boffins. The boffins were very motivated by their angst at the idea that the Germans would beat them to it, and did not realise that the bomb was “for Russia” all along.

      The bombs on Japan were simply political instruments for intimidating the USSR, and effects tests. They had nothing to do with the Japanese surrender, which was decided by the Red Army destroying the vast Japanese Army in Manchuria.

    • #37968
      AHH
      Blocked


      ☝️ he’s dropped another 10 years!
      After facing deliberate stalling on a permanent ceasefire for about eight months, did the Palestinians just tell Zion to shove it?? BTW, this is one of ruthless leaders we discussed who would eventually come to the fore.. note his expertise is handling not only war and like Nasrallah understands the mind of the zionazi enemy, but has experience dealing with internal snitches and hypocrites.. the leading mechanism of Anglo-Zionist assassination is invariably the snitch rather than proferred high tech surveillance..


      Godspeed heroes of the anti-satanic forces!


      Excellent historical review of the evolution of Hamas. Note the return of Hamas to Syria. Yahya Sinwar (Yahya = John in Arabic) was chosen by the leadership that has returned to Damascus. The old “Qatar & Turkey 5-Star-Hotel” political cadre is being sidelined..
      PS – listen to true words of the Martyr Nizar Banat, who we discussed around October last year when highlighting the hypocrisy and crimes of the Palestinian Authority. Powerful! And his words grow like an oak by the day, after we see the certain Arabs defending Zion. Fortunately all this riffraff are not for long in this long suffering world.


      I am not sure where he is sitting, if its in the hall shaped like a viper’s head, but the serpent like shape of that mike! He actually may be sincere in pleading for a ceasefire! The Jesuits above all, begin to understand the Old Order is being torched. The coming of the AntiChrist heralds their, and the West’s, utter destruction as the discarded old hosts

      ↕️ last image of Jerusalem on this euphoric broadcast. What’s missing?

    • #37974
      AHH
      Blocked

      Yes i agree with Karlof1 this is a wierd hullaballoo. I dont care much for he-said,  she-said, spin operations.

      I suspect the hardliner Ryabkov meant exactly as we thought. But he may have jumped the gun, being NOT cryptic enough for once. Or his Stavka had second thoughts, or the quick retraction was part of a move.

      The Russians, for various existential reasons, continue to coddle the satanists, and pretend it is still an SMO. And certainly do not want to keep raising the temperature on the events underway. Better to defeat the lunatics without providing oxygen for excessive hysterics. And the recent spy-exchange is a positive signal that can perhaps, just maybe, provide a toehold.

      Hope dies last. And those civilizational-states have a frustrating legalistic approach to everything

    • #37978
      emersonreturn
      Participant

      Contship Ono!  Ono??  surely it cannot be the same family?

    • #37998
      AHH
      Blocked

      💠 @DDGeopolitics:
      ⭕ 🇷🇺💬🇬🇪Russia is ready to provide assistance in developing a dialogue between Tbilisi, Sukhum and Tskhinvali in order to establish lasting peace in the region, Zakharova said.

      She noted that Moscow is in favor of the parties to begin developing an agreement on the non-use of force between Tbilisi, Sukhum and Tskhinvali. The launch of the process of delimitation of the Georgian-South Ossetian and Georgian-Abkhaz state borders will contribute to the stabilization of the border areas. [such good news. Peace is descending on Transcaucasia. Shoigu was in Baku two days ago too. Off the western chessboard, except for isolated Armenia..]
      ⭕ 🇪🇪🇷🇺Estonia has introduced full customs control for citizens and goods from Russia – previously it was carried out selectively.

      Now travelers who cross the border on foot will be fully checked along with their luggage. If a person crosses the border by car, both the car itself and the things inside will be checked.

      The tightening of measures applies to the border crossing points of Narva, Koidula and Luhamaa, clarified Estonian Prime Minister Kristen Michal. [such sad news. Europe continues to dig its grave deeper]

      💠 @Fotros Resistance:
      ⭕ ANOTHER meeting between the Foreign Ministers of Iran 🇮🇷 & Jordan 🇯🇴:

      After the conference in Jeddah, Iran’s FM emphasized the necessity for all countries to take a unified stance in strongly condemning the Israeli regime’s crime in the assassination of Martyr Ismail Haniyeh and to arrange appropriate mechanisms for legal and judicial pursuit of this major crime in international forums.

      Jordan’s foreign minister, while condemning again the terrorist act of the Zionist regime in the assassination of Martyr Haniyeh in Tehran, emphasized the need to stop the brutal attack on the Gaza Strip as the key to establishing stability and peace in the West Asian region.
      [Jordanians continue to be put in the Wringer. Unhappy poodles. Iran and Resistance obtained the sought minimum at the compradore OIC summit in Jeddah. More legal and moral ammunition, as well as isolation of the regional compradores. As BRICS is taking over the UN, and the AES from ECOWAS, the Resistance is taking over the Islamic world from OIC… the era of $2 whores is ending]

      💠 @Strategika51:
      ⭕ Tribal forces backed by the Syrian army have surrounded several oil production sites in eastern and northeastern Syria.
      ⭕ The Syrian army is pounding the positions of pro-US Kurdish militias east of the Euphrates in support of tribal forces engaged in an offensive.
      ⭕ Tribal forces supported by the Syrian army 🇸🇾 have reclaimed 82 square kilometers of territory, and the United States 🇺🇸 are beginning to carry out air raids on their positions.
      It seems that Washington did not expect this scenario.
      ⭕ The US Deep State wages war without waging war. It is the main belligerent in Ukraine, Palestine, Syria, Iraq, Myanmar and wherever there is potential for conflict. Its posture is to deny any involvement while attacking at every turn…
      ⭕ Latest video from Lebanese Hezbollah. It is highly likely that the Lebanese Hezbollah will launch serious reprisals against Israel, with or without the advice of Iran.  |media|
      [What the Resistance has achieved is astounding. Lebanon is planted unmovable like their mountains and hills, raining fire from the skies, effecting decolonization of increasing tracts of north Palestine, even before full war! And they helped crater Zion’s MIC and farms and thus economy. Yemen cleared the Seas, further cratering the economy. Hamas revolutionized urban warfare against overwhelming odds, numbers and tech, attriting the entire combined West in landwar! And they helped finish off what was left of Zion’s economy through endless mobilization of the settler state, and collapsed morale through making clear Palestine could never be defeated. All this achieved through piecemeal minor steps, by boiling hubristic frogs.]

      💠 @ejmalrai:
      ⭕ The most plausible and only scenario prepared to retaliate against #Israel’s aggression:

      #Hezbollah might strike first, prompting a response from #Iran. Iran could initiate the conflict, causing Hezbollah to follow. Alternatively, #Yemen’s Ansar Allah could retaliate first, followed by Hezbollah and then Iran. Hezbollah could also begin the retaliation, with Yemen and then Iran reacting. Iran might launch the first attack, with Yemen and Hezbollah following in succession, or it could be Iran, then Hezbollah, and finally Yemen. #Iraq could strike first, leading Iran, Hezbollah, and Yemen to follow in any order. Iran might attack first, followed by Iraq, then Hezbollah, and Yemen. Hezbollah could start, followed by Iraq, Iran, and then Yemen. Yemen could initiate, followed by Iraq, then Iran, and Hezbollah.

      Alternatively, Iraq might strike, then Iran, followed by Yemen and Hezbollah. There’s also the possibility of simultaneous attacks by all four, or staggered attacks with varying delays.

      Alternatively, Iran, Hezbollah, Yemen and Iraq wait and allow the US, Israel and their allies to remain on constant alert for a while.
      [LOL]

    • #38003
      Mr P
      Participant

      (almost) “Never before in History”.. (an old WW2 slogan of the German nazis)

      “DD Geopolitics
      🇩🇪 German exports have been falling since 2022, this decline is not smooth, but in leaps and bounds. Right now, another such failure in the export of German products has been recorded. Demand has fallen in the EU and the US, while slightly increasing in China.

      But the most important indicator is something else: for the first time, Germany’s imports exceeded its exports, meaning that the country’s trade balance became negative, something that has almost never happened in history. Is it worth mentioning how important this is for Germany, which largely lived off the sale of its goods to other countries.

      🔴@DDGeopolitics
      5.4Kviewsedited  03: “

    • #38034
      AHH
      Blocked


      See his comments at end. As I said, every westerner storm trooper on occupied land in West Asia, or fighting for satanic Zion, is a dead man going forward. The civilizational-states have drawn the line. If genociding and jail gang raping of innocent men grabbed off their own streets is their “value thing,” they can keep to their own lands and spread that kind among themselves.


      Recall predictive programming from Dune: The “messiah” will nuke the “spice fields” to collapse his former Empire. Iran doesn’t need to do anything, including closing Hormuz. Only one side rushes to seed as much Chaos worldwide as possible – and it ain’t the civilizational-states. FFs and whatnot can be attributed to them when the desert Bedouins are pulverized back to their barren deserts. The Old Order will be ended, come what may. Westernesse Delenda Est.

      💠 🌎🛡GEOPOL360🕊🌍:
      ⭕ 🇨🇳 Chinese military conducts joint patrol around Scarborough Shoal

      The Chinese military conducted a joint maritime and air patrol around the Scarborough Shoal on Wednesday, amid ongoing tensions in the South China Sea.

      The People’s Liberation Army’s Southern Theater Command said it held a joint patrol in the waters and airspace near the shoal on Wednesday, “with the aim of testing the theater troops’ capabilities in reconnaissance, early warning, rapid mobility and joint strikes.”

      The patrol came as Manila held its first joint military exercise with the United States, Canada and Australia on the same day, following a first joint exercise between the Philippines and Japan last week.

      💠 @Middle East Spectator:
      ⭕ Israel has begun the construction of tent cities in the Negev desert, in case of a mass displacement of civilians from northern Israel
      ⭕️ Hebrew Media: ‘The IDF leadership is concerned that the longer Iran takes to respond, the more severe the response is likely to be; there is also the possibility of a series of ‘continuous responses’ until the war on Gaza ends’
      ⭕️ Benjamin Netanyahu: ‘We are facing the entire Iranian ‘Axis of Horror’ and we must prepare to defend against this regional anti-Israel alliance’

      💠 @Sputnik Africa:
      ⭕ Not a single soul: Israel’s Ben Gurion Airport in Tel Aviv is virtually deserted after most international airlines canceled flights to and from Israel following the recent escalations in the region |media|
      ⭕ ♥️Major world events through the morning of August 8
      🟠 Thirty-four victims of Ukrainian shelling in Russia’s Kursk region are currently under hospitalization, including 5 children, the assistant to the head of the Russian Ministry of Health reported;
      🟠 US President Biden said that he was not sure about the peaceful transfer of power in the United States if Trump is defeated;
      [iow, another stolen election to come, if it happens at all]
      🟠 Washington is not obliged to act as Europe’s defender; countries like Germany should invest in their own defense and be self-sufficient in the military sphere, said US Republican vice presidential candidate Vance.
      [Used puppets are being contemptuously discarded]
      ⭕ ❗️The losses of Ukrainian troops during the past day amounted to up to 2,110 people, according to the latest report of the Russian Ministry of Defense

      More statements from the ministry’s daily briefing:
      🟠 Russian strikes hit Ukrainian drone assembly shops;
      🟠 Russian air defense systems shot down a Ukrainian MiG-29 jet;
      🟠 A British Spartan armored personnel carrier was destroyed.
      ⭕ 🗣 Not a bit of regret: Comments by the American authorities on the situation in the Kursk region are “outrageous,” the Russian ambassador to the US says

      According to Anatoly Antonov, public statements by US officials lack both condemnation of Ukraine’s actions and condolences to Russia.

      “No one hides the fact that American weapons became the weapon used to kill ordinary Russians,” he said. “Attacks on schools, hospitals, ambulances, and residential buildings in Russia cannot be recognized as a right to self-defense.”

      The ambassador said that Ukraine’s ongoing attack on Russia’s Kursk region is a provocation on Kiev’s part, and no matter how hard the enemy army tries, Russia’s forces “will systematically and progressively move forward, liberating Russian lands.”

      Antonov also stressed that none of the terrorists will be able to avoid retaliation, as Russia’s borders are “sacred.” Washington, for its part, should stop supplying weapons and “punish the neo-Nazis from the Armed Forces of Ukraine.”

      💠 @Strategika51:
      ⭕ The illustrative photograph of Egypt’s President Abdelfattah Al-Sissi speaks for itself…
      ⭕ Israel respects nothing. Neither international law, nor the Vienna Conventions, nor the Geneva Conventions.

      The Israeli government wants to do something unprecedented: revoke the diplomatic status of Norwegian envoys to the Palestinian territories.

      Reaction from the Norwegian Ministry of Foreign Affairs:

      “Today we received a message from the Netanyahu government that it will no longer facilitate the work of Norwegian diplomats in the Palestinian territories.

      This is an extremist act that fundamentally affects our ability to help the Palestinians.

      The Israeli decision to revoke the diplomatic status of members of our embassy is an extreme act that will have consequences.

      We are studying the measures Norway will take to respond to the situation created by the Netanyahu government”.

    • #38042
      Mr P
      Participant

      Intel Slava Z
      🇺🇸 🇮🇷❗️US Air Force F-22 Raptors arrive in Middle East to prevent regional escalation by Iran – US Central Command

      https://tass.ru/mezhdunarodnaya-panorama/21563195

      excerpt>

      US airlifts F-22s to the Middle East
      This is done in case of an escalation of the conflict between Israel and Iran, the US Central Command said.
      NEW YORK, August 8. /tass/. The United States has deployed fifth-generation F-22 Raptor fighter jets to the Middle East in case the conflict between Israel and Iran escalates. This was reported by the Central Command of the US Armed Forces (CENTCOM).

      “F-22 Raptors arrived in the CENTCOM area of responsibility on August 8 as part of the redeployment of US forces to contain a possible escalation in the region by Iran and its allies,” the command said on its Twitter page.

    • #38046
      AHH
      Blocked

      💠 @DDGeopolitics:
      ⭕ 🇬🇧 Arrests have begun in England for posting “innacurate information on social media.”
      [That didn’t take long!]

      💠 @ejmalrai:
      ⭕ More than a dozen Western and Arab leaders have contacted #Iran to intervene on #Israel’s behalf, asking it not to retaliate or to target only military bases. The list is long. If @Netanyahu is so afraid of retaliation, why does he attack sovereign states? He thinks he has impunity and can do whatever he wants? Not with Iran and #Lebanon
      ⭕ I hope nothing happens tomorrow in the Middle East, but after that, I am available on Saturday and, eventually, Sunday
      [Me too!]
      ⭕ Those who said #Iran won’t retaliate against #Israel’s violation of the Islamic Republic’s sovereignty and for the target assassination of Iran’s guest will soon realise they were mistaken. Likewise for #Hezbollah #Lebanon.

      💠 @imetatronink:
      ⭕ The object is to suck as much of the opposing force as possible into the fire bag. If there is a chance to lure in 3 full brigades (as some suggest), you need a big bag. And, as seen in late 2022, the Russians excel at punishing an advancing army during a strategic withdrawal.
      ⭕ The notion that the Russians did not observe the entire buildup is total nonsense.

      There are no longer any such secrets in this war.

      Just like in October 2022, the Russians saw it, and made plans to accommodate it in order to more easily destroy it.

      That’s how they roll.
      ⭕ I don’t believe for a moment that the Russians lacked precise information regarding the Ukrainian order of battle in front of them. There has been a significant amount of chatter for weeks that AFU forces were massing in Sumy region. There was no “surprise factor” at work here.
      ⭕ 🤔 Why Send F-22s [to Middle East]?

      In relation to the deployment of several F-22s to the Persian Gulf region, I confess I am somewhat puzzled.

      The F-22 is an air-superiority fighter. It’s not a strike aircraft. It’s probably able to shoot down slow-flying drones and cruise missiles, but carries a much smaller payload than the F-15.

      So what’s the point?

      Perhaps they have reason to anticipate a little Russian intervention? That seems highly unlikely. But otherwise I can’t make much sense of this deployment [could these be the modern equivalent of Slim Pickens’ one-way ‘Wing Attack Plan R’ ??]

    • #38051
      Mr P
      Participant

      F22 can carry bomb type B-61  – a nuclear bomb of variable yield, ie a hydrogen bomb.

      (I think that’s on the “option list”…and of course it’s as you say, supposed that the “enemy” (Russia) may send some sexy airplanes too. 

      at https://en.wikipedia.org/wiki/Lockheed_Martin_F-22_Raptor I do not see this spoken of.

      It is pretty sexy flying machine. However “stealth” depends on assumptions about the type of radar the putative opponent has. I note Ruskie radars are also very sexy, and that the big jamming systems now present in the zone of assumed target may present two big non-assumed conditions. These are: 

      1) The high power jamming may well disrupt the function of the aircraft.

      2) In theory the high power jamming may, probably does, “light up” whatever radar cross section the aircraft presents. This illumination can, imho, be integrated to a radar to reveal the illuminated, ah, “target aircraft”. (I recall that at big air show the F35 was easily tracked by a modern radar.) 

      This radar business is evolving, and the Soviets, er Reds, er, Ruskies are very good at it. 

      • #38053
        AHH
        Blocked

        The evil symbolism. They arrived on Nagasaki Day

        • #38056
          Mr P
          Participant

          Nagasaki remark of yours most astute. It had not occured to me.

          I note that the target was the city center. iirc Bocks Car missed by about 2 miles, and hit the mitsubishi factory. Let’s hope “plan R” goes wronger n that!

    • #38052
      Mr P
      Participant

      “Pentagon Press Secretary Sabrina Singh stated that the U.S. views the Ukrainian incursion into the Kursk border area as “actions to protect against attacks from this region.”

      The Pentagon also stated that strikes with American weapons in the Kursk region “align with U.S. policy.” ”

      https://t.me/DDGeopolitics

      Doctorow says the attacking force was/is top notch soldiers with the best NATO (US) machinery and following precisely NATO Doctrine. (@ Napolitano) This carries serious implications, the deductions from which are obvious. Such as who planned it and who leads it and what was the actual intended goal. Delusions meet reality.  

    • #38057
      Mr P
      Participant

      nazi play with numbers….just like the old days…

      https://www.zerohedge.com/energy/numbers-arent-jiving-real-world-huge-revisions-leave-traders-questioning-biden-admins-energy

      To convey the illusions of legalistic appearance the nazis of old  called their coup Machtergreifung. Similarly> 

      https://www.zerohedge.com/political/50-years-bait-and-switch-behind-post-watergate-reforms

      Provocation> 

      https://www.zerohedge.com/geopolitical/israel-strikes-airbase-central-syria-known-house-russian-troops

      Of Kurst> I note the method may be to fall back under fire and thus entice the nazis forces to enter what will become a salient, requiring logistical train of equipment of soldier, which then is closed into a kettle – with the design of utter liquidation the nazi force. The Br’r Rabbit game. The Old Army Game.

    • #38059
      Mr P
      Participant

      Of F22 and F35 zone ME > some specifics, if it’s believed. Such as where they landed.

      https://www.zerohedge.com/military/twelve-f-22-stealth-fighters-reportedly-inbound-middle-east

    • #38074
      AHH
      Blocked

      💠 @DDGeopolitics:
      ⭕ 🇺🇦🏃Movement is life, especially if you are from Ukraine  |media|
      ⭕ 🇷🇺⚔️🇺🇦 The Russian Ministry of Defense reported the interception and destruction of 75 UAVs overnight (26 over Belgorod, 19 over Lipetsk, seven over Kursk, five over Bryansk, four over Voronezh, one over Oryol, five over Crimea, and eight over the Black Sea).

      Additionally, seven unmanned boats heading towards Crimea were destroyed in the Black Sea.

      There were several hits on Lipetsk, with 9 civilians reported injured.

      The airfield in Lipetsk was also hit, but no planes were destroyed as they were moved before the raid.

      💠 @Intel Slava Z:
      ⭕ 🇷🇺🇺🇦Meanwhile, the Gauleiter of Sumy Oblast complains about the work of the Russian Aerospace Forces. According to him, over 100 glide bombs were dropped on the border area in two days, while in total about 450 were dropped in the first 7 months of this year.
      ⭕ 🇺🇦The regions of Ukraine bordering Russia are urgently looking for blood donors. Locals report that a large number of wounded Ukrainian Armed Forces soldiers are being pulled to the rear.
      ⭕ 🇷🇺🇺🇦The Ukrainian Armed Forces lost more than 280 soldiers and 27 armored vehicles, including 4 tanks, in the border area of ​​the Kursk region in one day (c) Russian Defense Ministry

      According to the Russian Ministry of Defense, total losses since the beginning of the Ukrainian Armed Forces offensive on the Kursk region are up to 945 soldiers (killed and wounded) and 102 armored vehicles, including 12 tanks and 17 armored personnel carriers.
      [This is just the Kursk direction, not counting the usual 2,000-4,000 ground down in the main fronts!]

      💠 @Hamas/Tsahal:
      ⭕ Al Shayrat Air Base in Homs, Syria, was reportedly targeted by Israeli Air Force preemptive airstrikes last night.

      ➡️ Al-Shayrat Air Base is a joint base run by the Islamic Revolutionary Guard Corps [Iran], Syria, and Russia.

      A weapons depot/storage facility was reportedly targeted.

      The official Syrian news agency SANA, citing a military statement, reported that four soldiers were injured in an Israeli airstrike in central Syria.

      The statement said the attack also caused “material losses.”
      ⭕ Israeli Prime Minister Benjamin Netanyahu says his country will not relinquish control of the occupied West Bank.

      “It is part of our homeland. We intend to stay there,” Netanyahu said of the Palestinian-controlled lands in an interview with TIME magazine published Thursday.

      The Israeli premier also reiterated his opposition to the creation of a sovereign Palestinian state, suggesting he favors limited autonomy for Palestinians as long as Israel maintains security control over the occupied territory.

      “We do not rule their land. We do not rule Ramallah. We do not rule Jenin,” Netanyahu said, referring to Palestinian cities in the West Bank. “But we go in and act when we have to prevent terrorism.

      💠 @Strategika51:
      ⭕ China’s CGTN calls the Kursk offensive one of Ukraine’s biggest attacks on Russia.
      ⭕ Washington remains totally silent on the evolution of the war in Ukraine.

      At the same time, the United States has just reversed roles in the conflict in Palestine, claiming to have brokered a ceasefire in Gaza that could be jeopardized by Iranian action.

      It’s an interesting tactic of ambiguity, reversing the role of the aggressor under attack and jeopardizing a ceasefire for the benefit of the population that the other party claims to be defending.

      The Mafia will never be able to rise to this level of “villainy” in the Machiavellian sense.
      ⭕ There are reports of the formation of armed groups by the populations of Russian villages in the Kursk Oblast.

      Russian civilians are taking up arms to compensate for the absence of the armed forces in rural areas affected by enemy shelling.

      It’s a bad omen, as the loss of life is reminiscent of the USSR in the Second World War.
      [Putin ordered disbursement of arms stocks to locals too, if I understood correctly. But I am not monitoring this doomed salient as much, or most of 404. Permitting this suicidal fire sack to the combined West DOES raise ethical questions of tolerance of civilian losses]
      ⭕ US Air Force reinforcements in Jordan: US F-18 fighter jets arrive at Jordan’s al-Azraq base to reinforce air defenses and intercept any missiles or drones launched from Iran towards Israel. The US military presence in the Eastern Mediterranean, the Middle East, the Gulf and the Red Sea to defend Israel is quite impressive, if the contributions of allied countries are taken into account.
      ⭕ North Africa: a resumption of hostilities in Libya is highly probable, following the dangerous maneuvers of Field Marshal Hafter and his son, aimed at Fezzan and taking control of Ghadames and establishing checkpoints on the Tunisian and Algerian borders to the detriment of the Tripoli government.

      As a reminder, Hafter’s forces are backed by Wagner (Africa Corps), the United Arab Emirates and Egypt, while the Tripoli government, the only one recognized by the United Nations, is supported by Türkiye [& NATO].
      [As I said last year, a major metric of Armageddon shall be when all frozen conflicts worldwide “thaw” in sudden tandem.. Kosovo/Serbia is another right now]
      ⭕ Libya 🇱🇾: forces of the Libyan National Army, the armed militia of Field Marshal Khalifa Hafter and his son Saddam Hafter, are advancing in force towards the town of Ghadames, at the junction of the Libyan, Tunisian 🇹🇳 and Algerian 🇩🇿 borders.

      The Tripoli government expresses its deep concern and is preparing to deal with the situation.

      With the civil war situation in Mali and guerrilla warfare in Niger, there is a major angle to these maneuvers which we will address in due course.
      ⭕ War in the Middle East: most of the media linked to what is commonly referred to as the “axis of resistance” do nothing more than relay the hot and cold messages constantly blown by Israeli propaganda. The latter has become an expert in the art of lament and pessimism, and media affiliated to or sympathetic with Iran fall for it. 100% of the most apocalyptic scenarios concerning Israel, including the prophecy of destruction in 2026, come from the Israeli media.

      In retrospect, Israeli propaganda has always adopted the following approach: Jeremiads and complaints—>Pessimism and victimization—>Triumphalism and self-sublimation.
      ⭕ Iran 🇮🇷 has received cruise missiles, ballistic missiles, electronic warfare systems, anti-ship missiles and air defense systems from Russia 🇷🇺.
      ⭕ The Pentagon believes that the United States has deployed considerable forces in the Middle East and that Iran has no reason to strike Israel. [LOL! FAFO]

    • #38079
      AHH
      Blocked


      ☝️ just the first 16 min. I agree, and note the arrival of the Belarusians, the delay in Iran and the regional Axis’s retaliation has been due to expectations of ever cascading reprisals and counterstrikes (if the mad West doesn’t immediately jump to nukes) that coalesce all global battlefields into the hot phase of WW3.

      💠 @Middle East Spectator:
      ⭕️ A senior Israeli official called the statements from Jordan, Egypt, and Saudi Arabia that they will not allow their airspace to be used to counter an attack from Iran “very disturbing”, according to The Washington Post. The official expressed growing fears in Israel about the effectiveness of its air defense.

      💠 @Fotros Resistance:
      ⭕ 🇮🇷 The IRGC-N (navy) took a massive delivery of a new generation anti-ship missiles for coastal defenses.

      From left to right:
      —> Fath, Moghaddam-360 variant with terminal guidance seeker, supersonic end-game speed
      —> Unknown new cruise-missile, likely a RAM-jet powered Kh-31-like supersonic CM
      —> Abu-Mahdi, 1000km+ range heavy, subsonic anti-ship cruise missile
      (Via Patarames on Twitter/X)  |media|
      ⭕ The US transports new military assets to West-Asia to scare off Iran <—> Iran introduces new military toys to flip off the Americans telling them that we ain’t scared of yall.

      💠 @Strategika51:
      ⭕ War in Ukraine:

      Chechen President Ramadan Kadyrov promised to restore the situation in Kursk within two to three days.
      [Take care with this channel on any Russian matter. He appears emotionally and ideologically anti-Russian, perhaps understandable being an aching Frenchie]
      ⭕ First contact between the Hades/Akhmat unit and the British SAS 22nd Regiment hidden within the Ukrainian 82nd Airborne Brigade at Suja (Intel+)
      ⭕ In addition to the British SAS 22nd Regiment, the AFU 82nd Airborne Brigade is hiding US Ranger units, CIA Green Berets, elements of the French Hubert Commando, Polish Special Forces and US Navy Seals (Intel+).
      ⭕️ The Hades unit of the Akhmat special forces is currently broadcasting a message on a loop on an open radio frequency to Ukrainian forces entering Russia: “Welcome to hell! You will all be incinerated”.
      ⭕ Washington has sent a message to Iran, threatening it with economic annihilation and the disappearance of its government from the face of the earth in the event of Iranian military action against Israel.

      This is the first time the United States has threatened Iran with total annihilation.

      💠 @Arab_Africa:  
      ⭕ 🇱🇾 UN mission in Libya expresses concern over Khalifa Haftar’s forces’ activity in southwest Libya

      Following the Ikhwani Supreme State Council of Libya, which, by the way, does not have any particular power, but acts as an advisory body, the head of the UN Support Mission in Libya (UNSMIL), Stephanie Khoury, expressed her concern.

      “We call on all parties to exercise restraint and not to create provocations that could take the situation out of control. The mission calls on the Libyan National Army forces to continue to coordinate their actions with the Libyan Armed Forces of the Western Region.”

      It is worth noting that UNSMIL is an exclusively pro-American organization, the purpose of which is precisely to destabilize the situation in the country. Stephanie Khoury, for example, is an American old witch of Lebanese origin.

      And since such respected people are expressing concern, it means that Haftar’s army is moving in the right direction, and now we are even more confident that they are not alone .
      [In addition to finally unifying and healing Libya through evicting NATO ensconced like a radioactive tapeworm in tristate western regions, these moves also seek to shut off supply chains to terrorists and separatists in sub-Saharan Africa, such as Tuaregs, ISIS and other USUK pets]

      💠 @Palestinian Commie:  
      ⭕ ♦ PFLP: Sinwar capable of achieving Palestinian unity

      Deputy Secretary-General of the Popular Front for the Liberation of Palestine, Jamil Mezher, speaking to Al-Mayadeen:

      🟢 Choosing Sinwar as the leader of the political bureau is an initial response to the enemy and a confirmation that Hamas’s choice is resistance, and that decisions are up to the battlefield

      Brother Sinwar, by leading the Hamas movement, will give new momentum to the movement because he is a person capable of creating national unity and strengthening partnership

      What is Mezher really saying here?

      The PFLP Deputy Sec. Gen. (to imprisoned Sec. Gen. Ahmad Sa’adat, bottom-right photo) is spotlighting the fact that Yahya Sinwar, the new elected president of Hamas, has taken the movement away from corrupt politics and back to the essential goal: armed struggle for the liberation of Palestine

      Sinwar is credited for reconciling Hamas with Iran and the Axis of Resistance, and combating the US-Israeli efforts of Palestinian national split. He was a life-serving prisoner and spent time with the true leaders of the resistance, Marwan Barghouti – commander of Fatah’s armed wing (top photo), and Ahmad Sa’adat – commander of the PFLP… All the real Palestinian leadership is in prison, and that’s what the whole exchange deal is about: liberating those who can make a difference, and ending Israel’s excuse for occupying the recognized territories (the first step to the collapse of the Zionist project) – ending the national split, by uniting parties under one unity government, and freeing the one man who can make that happen: Barghouti 🟡

      Moreover, Mezher and all others who have made congratulatory statements these two days hint at one “silent” thing, which is the liberation of Hamas from the political pressures of “those guys”, whom we all abstain from mentioning during wartime… (more on that later). National unity has been solidified in Al-Aqsa Flood like never before, and all parties have shown no readiness to “condemn” Hamas for anything, despite having the biggest differences before the war. Internal dispute is replaced with full unity when faced with the Nazi enemy!

      Israel’s worst nightmare is being realized: all Palestinian factions, from Islamist to secular nationalist and communist, have understood the danger of national split, and are uniting hand in hand against the terrorist ZionNazi colonial entity (or as Mr. Kim 🇰🇵 best describes them: “Mercenaries of global imperialism, who call themselves Israel”)

      💠 @DDGeopolitics:
      ⭕ 🇷🇺 Gazprom has commented for the first time on the events in the Kursk region and their impact on gas prices on the European market.

      The events in the Sudzha area have led to a sharp increase in prices for both natural gas and LNG. On August 9, an annual peak in exchange prices was recorded, and it’s still summer. This raises the question: who benefits from this?

      The company also noted the upcoming preventive maintenance on Norwegian gas infrastructure, which could also affect market prices.
      [Wouldn’t want to be in Europe this Winter!]

      💠 @ejmalrai:
      ⭕ Remember that when #Israel targeted #Hezbollah commander Sayyed Fouad Shukr in #Beirut, the attack killed 7 Lebanese civilians and wounded over 85. When Hezbollah retaliates and civilians are killed, the scenario is no different. The lives of Israelis zionists are not more precious than any other lives, on the contrary
      ⭕ The first self-punishment

      Since @Netanyahu decided to violate #Lebanon & #Iran’s sovereignty:

      • 10,000 #Israelis stranded abroad every day as many flights cancelled.
      • Vegetable prices have doubled.
      • Israelis buy more alcohol, cigarettes and drugs.
      • Fruit and vegetables are rotting because all foreign workers have left and #Thailand has refused to send thousands of workers to replace Palestinians who are no longer allowed to work outside the West Bank.
      • Panic is overwhelming and Israelis are prepared to spend hours in shelters
    • #38084
      AHH
      Blocked


      He shouldn’t allow himself to get so worked up by the betrayal of well-known cowardly hypocrites. Egypt and Qatar are in the position of Germany and Japan. Just hopeless, and as doomed as their suzerain. There is a 0% chance of negotiations settling this, no matter how they flail and try to message surrender. And fortunately they’ve become aa irrelevant as their western suzerain as events and initiative move into the hands of the Resistance.


      ☝️ more on Ibn Khaldun’s ‘Asabiyyah, but this time how this intrinsic glue within all civilizations, or rather its absence, leads to Collapse. And then a new cycle rises from a new subgroup.

      https://thecradle.co/articles/as-war-widens-us-assets-become-easy-targets

      ☝️ note the FDI to GCC. Egypt wasn’t the only one openly bought. And note who gets the least FDI – a Jordan planned to host the Palestinian Exodus. The direction and movements of Big Money usually reveals sordid geopolitical moves underway — “follow the money.”

      The map of western bases is woefully inadequate. It doesn’t include dozens from Europeans, nor many others in region, such as in occupied Djibouti, Yemen’s Socotra, Cyprus, even abject Egypt which has US troops on Sinai, per 1979 Camp David surrender terms, etc etc. The entire region is armed and primed to the teeth.

      But the thrust holds: “US interests – both military and economic – will be at the heart of the confrontation;” The coming storm will solve and sink the demented West. USUK will be merely the latest satanic Empire to get buried in the Holy Land.

    • #38086
      Mr P
      Participant

      Remarking that enticing the big main nazi enemy to come with a massive effort that cannot be properly supported in logistical train to support its tottering outpost is far more practical than sending expeditionary forces across the seas. Although,in the fullness of time that too may well take place in the “mop up” phase. Ahem. Persian Strategists most subtle! (In a street fight I have heard a fella say “bring it”, altogether very droll.) Having said that, the inability of the Imperial Force to occupy the vast spaces and to subdue the obdurate peoples involved strongly suggests that simple ruining is the Imperial method planned. That probably implies nuclear explosives, perhaps biological ones as well, are within the Imperial designs. As determined, the F22 can carry such nuclear machines, and perhaps avoid destruction by Resistance Forces long enough to complete their missions. Some can get to their firing zone. The weapon, B-61, is a gravity bomb, the carrier must actually drop it somewhere not far from the actual target.

      Of Collapse.

      Ibn Khalden was unknown, many thanks. I believe Jared Diamond’s thoughts run approximately along similar lines. See book and wiki on Diamond> https://archive.org/details/jared-diamond-collapse   (full book and free to read)

      (and)

      https://en.wikipedia.org/wiki/Collapse:_How_Societies_Choose_to_Fail_or_Succeed

      and, which we have shared afore, the lecture on a previous episode of collapse that was bad, but not total>

      https://youtu.be/bRcu-ysocX4      1177 BC: The Year Civilization Collapsed (Eric Cline, PhD)

      (this latter may especially interest the many thousands of silent reader of Global South)

      as may the Deagel Forecast Deagel 2025 Forecast By Country : Deagle : Free Download, Borrow, and Streaming : Internet Archive  (read, weep, or pretend it ain’t so and sip more of favorite drug, fellas an gals)

       

      • #38092
        Mr P
        Participant

        Perhaps, despite the poor moral choices of the author, we ought to remember that what he wrote is not dependent upon those choices – thus Industrial Society and Its Future  by Ted Kaczynski

        https://archive.org/details/kaczynski2

         

    • #38094
      Mr P
      Participant

      Cyprus becomes a fortified fire-base for fascist empire to protect the nazi client outpost…and smash any forces that object. By this it also becomes a juicy target zone. 

      (not everybody is able to read Duran, hence the lengthy quote)

      “Danroc@Danroc 1 hour ago

      @theduran Cyprus – A Strategic Zionist Hub Subjected to Forced Militarization (3/7):
      Despite explicit warnings from the resistance for Cyprus to not involve itself in matters that don’t concern it, the island has witnessed a surge in diplomatic and military activities in the last two weeks, serving as a strategic hub for the zionist entity. Flights have increased from “Tel Aviv” to Cyprus in recent days as the island serves as a key evacuation point for Western diplomatic staff from Lebanon and the zionist entity. Military exercises have also previously been conducted there simulating attacks on southern Lebanon and Iran, with current exercises being carried out in Greece.

      According to Al-Akhbar, a large American military delegation arrived in Cyprus in recent days, bringing with them a massive amount of equipment, weapons, and air defense systems. Cypriot officials stated that they had never before seen such quantities of weapons, acknowledging that their purpose is to turn Cyprus into an interception platform for the expected responses from Iran, Hezbollah, and Yemen.

      Further, British bases, which occupy about 5% of the island, strengthened their presence with air defense systems and experts, as did German forces in Cyprus that seek to help with evacuations. The German government has also approved the deployment of transport planes, naval vessels, and forces in order to assist with the evacuation of its EU nationals from Lebanon and the zionist entity.

      Hurriedly, American forces also recently requested to start joint military exercises in Cyprus, a matter that typically takes years of planning. In the end, what is happening to Cyprus now is a militarization of the island seemingly against their will, but it doesn’t make it less of a partner in the aggression, especially in light of hundreds of British spy missions over Gaza having taken off from Cypriot bases since October 7th.

      Be careful Alex. Might find yourself in the thick of it. Hope not. Though it would be nice to see the military bases hit. “

      • #38104
        AHH
        Blocked

        “Cypriot officials stated that they had never before seen such quantities of weapons, acknowledging that their purpose is to turn Cyprus into an interception platform for the expected responses from Iran, Hezbollah, and Yemen.”

        I agree Cyprus is a western island hub to fall back upon as Zion, and most West Asia, is overrun, Dien Bien Phu-style, and also to serve as ammo, C&C & hardware depot, but this latter point as AD platform appears pure disinfo? I read Patriots interceptor radars have a reach of 150km? Even the world best Russian AD such as S400 has maximum coverage of 4-500km?? So logically, being on Cyprus, about 300km+ from coastal occupied Palestine, would do them LITTLE or ANY good, especially if the expected Iranian waves will largely consistent of very fast missiles this time. And even less time wrt to Hezbollah, and who may elect to focus on using drones.. and to cover all Zion from Cyprus is an additional 100km, for total of 400-450km!

        So Cyprus is mostly about pure aggression. Evacuations are likely another BS, keeping in mind how most of the West refused jewish boats fleeing Hitler to disembark and sent them onwards to Zion. The West could care less about jewish lives, save as disposable pawns. Yeah, Younger Alex should get out. Even coastal Greece or near NATO bases won’t be safe for what comes.

        • #38107
          Mr P
          Participant

          Yes. I recall the lack of concern for civilians characteristic of nazi doctrine – it’s just ignored or celebrated when innocent women and kid and men are ripped to pieces, raped, or used in any way. Recall that Nagasaki designated target was the city center – women and kids and old men, and the bombs were “effects tests”. Recall the “strategic bombing” of German cities, the wholesale wonton murder in the European war, and in China, and Korea and in Vietnam…and that the only reason Hiroshima and Nagasaki were not already burned was to save them for the atomic tests – most, dozens, of other Japanese cities were already ashes – and just now in the Kursk salient, and in Odessa Trade Union building, and at the Maidan in 404. And at 911 too. Cyprus is a support base being fortified for attacking the Persians and the other civilizational states.

    • #38095
      AHH
      Blocked

      💠 @Middle East Spectator:
      ⭕ Russia has banned its aircrafts from flying over Israeli airspace between 07:00 PM and 01:00 AM until August 16 amid ongoing tensions
      [So, this means the first wave of Resistance retaliations will commence within the next week. Defense postures were firmed and the OIC imprimatur was obtained. Civilizational-states are ready to rock]
      ⭕️ 🇮🇷/🇷🇺 NEW: Iranian 130mm shells for the M-46 artillery cannon being used by the Russian Armed Forces

      💠 @Sputnik Africa:
      ⭕ ♥️Major world events by the evening of August 9

      🟠 Vladimir Putin held an operational meeting with the permanent members of the Russian Security Council. The issues of combating terrorism were discussed, the director of the Federal Security Service made a report;

      🟠 A Russian Su-34 fighter-bomber struck a concentration of Ukrainian military personnel and equipment in the Sumy region [of 404] near Kursk with a FAB-3000 bomb, the Russian defense ministry reported;

      🟠 Fifty-five people, including 8 children, injured in the Ukrainian shelling of the Russian Kursk region are being treated in hospital, Russian Health Minister Murashko reported;

      🟠 US President Joe Biden again left his workplace in Washington before the start of the weekend to go to a resort. Early on Thursday evening, the head of state left the White House and flew to the state of Delaware. The US president is expected to spend the rest of the week at his home in the resort town of Rehoboth Beach.
      [This retreat has at least two fold messaging:

      1. to seek to scare the civilizational-states that the main enemy, on the cusp of Armageddon, is headless, further removing guardrails and increasing conflagration risk.
      2. the Holy Land will be fought for, no matter the odds and price. In the Bible, Rehoboth is in the Holy Land, connected to Jacob (Israel) father of the jews. It is also “by the River (Euphrates)” — whence in Islamic Eschatology, per Imran Hosein, Armageddon will be detonated over control of the global financial system based on the petrodollar. Today, the key GCC OPEC swing states have the source of their oil/gas within a short radius of the mouth of the Euphrates off Basra, Iraq. So this is deep messaging by the Last Satanic Empire that they shall NOT retreat]

      💠 @Intel Slava Z:
      ⭕ 🇷🇸⚡️Serbian President Vucic said he received information from Russia about a coup being prepared in Serbia with the support of Western forces
      ⭕ 🇮🇷🇷🇺Iran will supply Russia with hundreds of Fath-360 ballistic missiles, Reuters reports.

      The agency calls these missiles an analogue of HIMARS.
      [Why would Russia have need of such vast rapid replenishment by DPRK, Iran et al, if the Ukies are nearly done?? Who will soon fill the next grinder?]
      ⭕️ 🇮🇷/🇷🇺 NEW: Iran denies the report, says it has ‘never delivered’ drones or missiles to Russia, and that it will not do so for ‘ethical reasons’ until the war in Ukraine is over
      [LOL. This is how it’s done, Admiral “Baghdad Bob” Kirby]

      💠 @Fotros Resistance:
      ⭕ 🇮🇷 IMPRESSIVE: Iran says it has monitored US warships including US aircraft carrier ‘USS Theodore Roosevelt’ in Strait of Hormuz few days ago.

      Iran said that the aircraft carrier could be sunk by 2 Abu Mahdi cruise missiles, & accompanying destroyers will only require 1 missile.  |media|
      [Dispense urgent extra rations of grog and benzodiazepines to the stricken pirate lads!]

    • #38096
      Mr P
      Participant

      KURSK AFFAIR COMMENT Ok, now let’s ask what would Stalin and Molotov and the fellas say, and do?

    • #38108
      Mr P
      Participant

      Comrade Medvedev seems to have moved the Red goal-posts to the Reichstag, again! berlin 1945

      https://t.me/DDGeopolitics/118926

      🇷🇺🇩🇪 Medvedev, after an article by Bild about the use of German tanks in Russia, promised to do everything to ensure that new Russian tanks end up in Berlin’s squares.

      We will do everything to make sure that the latest Russian tanks end up in Republic Square (the square in Berlin in front of the Reichstag).

    • #38110
      Mr P
      Participant

      Naturally I am shocked, shocked I say!

      🇷🇺 Another Color Revolution for Serbia?

      Sputnik learned from the Government of Serbia that the highest representatives of the Serbian government were provided with information by the special services of the Russian Federation about the preparation of mass riots and an attempted coup d’état.

      https://t.me/DDGeopolitics/118929

    • #38111
      Mr P
      Participant

      Showing the nazis the door, the coffee has been served, party is over….https://t.me/DDGeopolitics/118944

      Iraqi resistance targets US Base on the Iraqi border.

      – Heavy bombardment targets a US Army base in Al Hasakah region of Syria.

      – The Iraqi resistance heavily attacks the American Base.

      – Smoke is rising from within the base as a result of the attack.

      ……

      For the first time in months, the US occupation Kharab Al-Jir base in Hasakah, northeastern Syria, was targeted by drones, despite increased reinforcement at the base in recent days. Local sources report smoke rising from the base and preliminary reports of vehicles burning and wounded US soldiers.

      Yesterday, Iraqi sources reported that the US military “Abu Hujaira” base on the Syrian side of the Syrian-Iraqi border was targeted with a drone.

      ……….

      Sources claim that the targeting of the American base in Al-Jir, northeast of Syria, coincided with the landing of a military cargo plane for the Americans from Iraq, which landed in the base loaded with military and logistical equipment, ammunition and American soldiers.

      – Helicopter activity over the base was noticed.

       

    • #38120
      amarynth
      Keymaster

      Most of the discussions coming through now, that we have visibility to, are repeats and those that discuss the issues are mainly speculating.  I’ll try and put something out tomorrow to list the speculations, but there is nothing new, except Iraq targeting the US base.

      There is a major push from Egypt, Qatar, and the United States to get Israel and the Hamas movement to resume talks on the ceasefire in the Gaza Strip on August 15 in Doha or Cairo.

      This bit is from TASS

      “We have called on both sides to resume urgent discussion on Thursday, August 15 in Doha or Cairo to close all remaining gaps and commence implementation of the deal without further delay, Amir of Qatar Sheikh Tamim bin Hamad Al Thani, President of Egypt Abdel Fattah el-Sisi, and President of the United States Joe Biden said in their joint statement released by Amir’s Office.

      Intermediaries informed about their readiness to present the final draft of the agreement on ceasefire in Gaza and liberation of Israeli hostages.

      “The three of us and our teams have worked tirelessly over many months to forge a framework agreement that is now on the table with only the details of implementation left to conclude,” the leaders stressed. “As mediators, if necessary, we are prepared to present a final bridging proposal that resolves the remaining implementation issues in a manner that meets the expectations of all parties,” they added.

      Just a watchlist item.  Iran said they will not do anything to scuttle peace talks, but really, they still will take revenge.

      So, we are waiting.

      Jordan the mangy dogs announced that they will allow Israel use of its airspace to repel Iranian strikes.  In reality, this may be a lie, or it may not be a lie.

       

    • #38123
      AHH
      Blocked

      With crazed NATO troops openly invading Russia proper, Russia prefers to not notice and merely started the largest anti-terrorist operation on its soil…..

      💠 @DDGeopolitics:
      ⭕ Israel’s Defense Ministry has extended its contract with the Turkish-owned Dorad Energy to power IDF bases, despite Turkey’s ‘trade ban’

      Dorad Energy is co-owned by the Istanbul-based Zorlu Holdings.
      ⭕ Danish shipping company Maersk has reported a 45.1% drop in profits for the second quarter of 2024 due to Ansarullah’s Red Sea blockade.
      ⭕ Iran’s Representative to the United Nations: ‘The Zionist regime violated Iran’s sovereignity, to which there must be a decisive response; we support a ceasefire in Gaza, but a ceasefire has nothing to do with our inevitable reseponse’
      [This answers both all the hasbara lately that Iran changed its mind, and the US offer to finally enforce a ceasefire for Iran to not hammer their rabid outpost]
      ⭕ The United States approves the release of $3.5 billion in military aid to Israel
      [A good sign, as with 404, that they’re beyond desperate and kinetic options dwindle as they increasingly resort to optical measures to bolster collapsing morale]
      ⭕ The Biden administration is lifting a ban on U.S. sales of offensive weapons to Saudi Arabia, reversing a 3-year-old policy, according to Reuters

      “The Saudis have met their end of the deal, and we are prepared to meet ours,” a senior Biden administration official said.
      [LOL. This is sadism. The LAST in the region, at this pregnant moment in time, to strut and attack ANY neighbor on behalf of Empire are the desert Bedouins living fearfully inside glass skyscrapers. You can stick a fork in the concubines. They wait for the Denouement, to see who will be their next Master]
      ⭕ CONFIRMED: Strong explosions due to a drone strike on the American occupation base in ‘Kharab al-Jir‘ in Syria’s North Eastern province of al-Hasakah, by the Islamic Resistance of Iraq
      ⭕ — 🇺🇸/🇸🇾 The U.S. occupation base is still on fire following the attack
      [O vey]

      💠 @Fotros Resistance:
      ⭕ The israeli terrorist army carried out another massacre, killing over 100 Palestinians in a bombing this morning

      💠 @Strategika51:
      ⭕️ Russia has launched the biggest anti-terrorist operation in its modern history, declaring an anti-terrorist regime in the three oblasts bordering Ukraine: (from south-east to north-west) Belgorod oblast, Kursk oblast and Bryansk oblast facing Kharkov, Sumy and Novgorod Severski respectively.  |media|
      ⭕ The U.S. categorically refuses to reveal which Middle Eastern country has hosted its F-22 fighter jets because, they say, of the sensitivity of the host country.

      Good to know, the U.S. has transferred not 22 but all of its operational F-22s to the Middle East.
      ⭕ The targeting of the clandestine and illegal US military base at Kharab al-Jir, in northeastern Syria, coincided with the landing of a military cargo plane from Iraq, which landed at the base loaded with military and logistical equipment, ammunition and American soldiers.

      The attackers can say they were extremely lucky, as their rockets, most likely cheap Grads, hit the cargo plane seconds before it touched down on the runway.

      CentCom will say that there is one light casualty and another with a slight headache.
      ⭕ Some Syrian and Iraqi channels are talking about a kamikaze drone, not a Grad rocket.
      US fighter jets are currently flying over the border between western Iraq and eastern Syria (Media)
      ⭕ Gaza Strip: non-stop aerial bombardment and artillery shelling for hours. Khan Younes was targeted by naval artillery from the shore until nightfall. Other localities are being bombarded non-stop.
      ⭕ Jordan is home to US Air Force F-22 Raptors and F-18s, British Eurofighter Typhoons and French Dassault Rafales.

      Written 53 years ago: “There will never be a solution to the Palestinian problem as long as Jordan, created from scratch to defend Rothschild’s artificial entity in the Holy Land, exists.”
      ⭕ Extremist Israeli settlers harassing a Western pro-Palestinian activist who came to prevent their destruction of irrigation systems in rural West Bank communities.

      Not sure they belong to our time… |media|

      [not sure the entire West belongs among us either!!]

    • #38124
      AHH
      Blocked

      💠 @ejmalrai:
      ⭕ Israel has committed another massacre at a school in Hay al-Daraj in central #Gaza, killing at least 100 Palestinians and wounding dozens of IDPs. This is how @Netanyahu exerts his daily pressure on the resistance for failing to achieve his goals. Expect the most immoral army in the world to claim it was “targeting Hamas HQ”.
      ⭕ Israel deliberately kills civilians during ceasefire negotiations to force the other side to surrender, it is engaging in a tactic known as “coercive diplomacy” or “strategic violence.”

      That’s why @Netanyahu ordered his army to kill 30-100 Palestinian civilians every day, based on observation and daily massacres
      [He is among first renowned observers to finally notice! I pointed out the satanic algorithmic consistency of this Annihilation, every single day, more than a half year ago. It is perhaps the most terrible aspect. Knowing 1-500 innocent people will be killed or maimed every single day. And not as a negotiating tactic! Just to help raise the Moshiach through sheer injustice and global frustration. And in the process to assure the thermonuclear obliteration and permanent end to the demented West. All this likely baked in now… the coming of the AntiChrist on his throne by the Third Temple in tiny Zion CANNOT tolerate the existence of the Golden Billion, too numerous and unruly to control. They are the primary target of Armageddon. Armageddon assures their final exit from the Stage, and in FAR greater numbers than dared to be noted by even the gleeful scribes of Deagle; they understate matters, as the current tally of Palestinians already genocided is woefully undercounted]

      💠 @imetatronink:
      ⭕ ‼️ Plain Putin

      “Westerners supply weapons to Ukraine and say, ‘We don’t control anything further here, and it doesn’t matter how they are used.’

      “We can also say, ‘We have supplied someone with something, and we do not control anything further,’ and let them think about it.”  |media|
      ⭕ 🤔 I can’t quite figure out why this is so often the case, but if past is prologue, and if Iran et al. really do intend to launch a retaliatory strike against Israel, then I would expect it to wait at least until the American markets close for the weekend at 4:00 PM EDT today.
      ⭕ 🤔🧵 The Kursk Kauldron

      So … what’s the consensus estimate at this point for the total number of AFU combat effectives that got fed into this Kursk Kauldron?

      Appears they started with ~1000. I’ve seen wild guesses claiming as many ~8000 eventually crossed the border. I suspect it’s much closer to 2k than 8k.

      The Russian MoD claims to have inflicted ~1000 casualties as of several hours ago. No doubt that number has grown in the meantime.

      I wonder how the remaining survivors are going to pass the time between now and when the big boom with their name on it pays a visit?

      You know they know.

      They had to know perfectly well when they set out that it was a kamikaze run.

      But they were beyond fear; beyond hope; beyond feeling anything more poignant than the sorrowing of the damned.

      And so they will curse the gods of war, and wish to die, bereft of everything but to struggle with the sword for their lives.
      /1

      [I read somewhere alotta of these stiffs were convicts just released on this Mission Impossible. And of course, drugged up supremacist NATO lads, as cheap and plentiful as they come]
      ⭕ You know why you hid in that ditch, Blythe?

      – I was scared.

      We’re all scared.

      You hid in that ditch because you think there’s still hope. But Blythe, the only hope you have is to accept the fact that you’re already dead. And the sooner you accept that, the sooner you’ll be able to function as a soldier is supposed to function – without mercy, without compassion, without remorse. All war depends upon it
      /2
      ⭕ Shelter me from the powder and the finger
      Cover me with the thought that pulled the trigger
      Just think of me as one you’d never figured
      Would fade away so young
      With so much left undone
      Remember me to my love, I know I’ll miss her
      /3
      ⭕ “It is well that war is so terrible, otherwise we should grow too fond of it.”
      – Robert E. Lee
      4/4
      ⭕ “Putin fell for it and fell for the deception again for the fourth time.

      “The naivety of Russians is simply amazing.”

      This is facile nonsense, in my view.

      The conclusion that Putin was ever once deceived by western treachery is so manifestly false.

      Oh, sure, Putin has frequently played up the “we were deceived” line as a rhetorical device. But everything Russia actually did over the course of the past two decades+ was in urgent preparation to restore its military, its economy, and strengthen its global diplomatic prestige.

      Putin’s Russia was absolutely not ready to face NATO in 2014.

      And yet, with extreme boldness, Putin managed to reclaim Crimea, reinforce the Donbass against attack, and buy time for Russia to better prepare.

      They were still not fully prepared in February 2022, but managed their affairs remarkably well, all things considered. By July they had severely attrited the original version of the AFU, and have since then comprehensively destroyed two NATO/AFU hybrid armies.

      Every substantive statement from Putin from the beginning of this war to the present day makes clear that the minimum objectives are those he laid out on February 21, 2022: the most significant of which is the demand that NATO military presence be rolled back to its pre-1997 borders.

      This has been explicitly and repeatedly reaffirmed.

      But these things must be done delicately.

      Winning an existential struggle against a crumbling empire whilst still avoiding the scenario of many of the great cities of the world being turned to ashes and rubble … well, it’s a very dicey business.

      You can’t just “gird up your loins” and charge in with guns blazing.

      We’re living through the most complex collection of geopolitical dynamics in all of human history.

      There is immense risk and unpredictability at work.

      In my view, as I attempt to analyze the aggregate of considerations — both in Eastern Europe and around the globe — Russia, China, and Iran are clearly attempting to somehow cooperate to roll back Anglo-American hegemony, while yet avoiding nuclear war.

      And the events in Kursk over the past few days absolutely pale in significance in the broader picture of the current perplexities of the nations.

      The desperate raid-in-force in Kursk was destined from its outset to culminate in abysmal failure, and consequently the moment of collapse of the entire line of contact has now been greatly hastened.

      How can you people not see and understand that, regardless of any fault to be found in minute details, the overall Russian strategy — dating back to the beginning of Putin’s reign — has been characterized by historically rare strategic wisdom and necessary prudence?
      🤦‍♂️

      [Well said! Response to:
      “🇺🇦 🇷🇺 Ukraine gets green light from NATO for action in Kursk – Politico

      It is already more than clear that NATO escalated the situation and carried out a direct invasion of Russian territory and crossed any possible red line of Putin, which apparently he has an unlimited number of them.

      One thing is clear. After every attempt by Putin to enter into peace negotiations, he receives such a slap from which he cannot recover for months, and he pays for those exhibitions of his truce very dearly with many victims.

      For months, Ukrainian officials and some Western officials have talked about the possibility of negotiations as they prepare for action in Kursk.

      Putin fell for it and fell for the deception again for the fourth time.

      The naivety of Russians is simply amazing.

      Russia will never have peace while NATO breathes. Never. The only way for peace in Russia is when it is divided into 100 countries and the Russians dig in the mines owned by the globalists for $100 a month.

      Any truce to be signed is just another opportunity for regrouping, rearming and a new round of attack by NATO.

      Merkel and Hollande publicly admitted that they made a donkey out of Putin with the Minsk agreements just to buy time to arm Ukraine.

      There is no such thing as a “truce” in Ukraine by peaceful means. The only way for any truce is a natural border and barrier on the Dnieper River, as quickly as possible.”]

      • #38125
        AHH
        Blocked

        Note how the US Navy redefines Loss to the Ansarullah. Wordsmithery.

        • They’ve achieved “Stability” (per their deranged definition);
        • They’ve reduced “war risk” (by having ordered the shipping companies to avoid the Red Sea, to avoid embarrassing attacks which they cannot stop);
        • They’ve proclaimed there’s “no spike in inflation” (duh! Good to have Yellen and the statisticians on the home team, ready to massage any data to say whatever spin is needed. “Trust the Science!”)
        • They’ve proclaimed global commerce “self-healed” (well! Why did the French bother to dig the Suez Canal, and the Anglo-Americans fight to control it for several centuries?! But let’s do engage in doublethink, and ignore the nakedness of the former Hegemon…)

        Cute, eh? Certainly more professional lying than going to the corner floor, curling in the fetal position and sucking one’s thumb for relief…

    • #38133
      AHH
      Blocked

      💠 @DDGeopolitics:
      ⭕ 🇸🇾More than two decades later: Israelis acknowledge the success of Hafez al-Assad and the path he set for the resistance towards the liberation of Palestine

      Zionist intelligence specialist Danny Citrinowicz writes for Hebrew news agency “Maariv” (pub. Yesterday):

      “Hafez al-Assad, the late president of Syria, tried to achieve a “strategic balance” with Israel during his tenure. The chemical weapons that Syria produced and surface-to-surface missiles were central components of this goal. It seems that this thinking leads Nasrallah to understand that it is correct to use the same strategic balance to make sure that Israel will not be able to subdue the “Palestinian resistance”

      Comparing this to the current regional power dynamics, Citro… whatever, concludes that this “strategy” is now the philosophy of the Axis, since the balance of power between the Zionist state and the Axis has finally been achieved, and this has been the main tool in “preventing Israel from destroying Hamas”, since “the organization (Hezbollah) sees the downfall of Hamas as the first domino of Zionist expansion in the Middle East”… well, isn’t it?

      The rest of the pretty dumb article seems to come to the realization of what Sayyed Nasrallah has been saying in every speech for 9 months: The northern front will not cease until there is a total ceasefire in Gaza, “even if Israel changes its nature of actions”, and will continue to escalate in scope, range and nature of operations – especially in the anticipated response to the assassination of martyr commander Fuad Shukr. “Nasrallah presents Israel with two choices: a ceasefire in Gaza that will allow Hamas to survive militarily and politically, or the continuation of the campaign in the north”

      💛Well, so much for 20 years of funding Qatari Al-Jazeera propaganda to convince us that al-Assad sr. was a devil, sell-out, dictator who was eventually heading towards normalization with “Israel” (lol)

      🇸🇦 Hafez al-Assad’s Arab Socialist Ba’athist revolution remains alive 50+ years onwards, and will continue until the liberation of Palestine and restoration of a Levant free from American hegemony. The name still worries them to this day!

      (and yes, that’s Mr. Kim Il Sung in the photo with him)
      [Keep this in mind, long before Iran, decades earlier, Syria was on the warpath against Zion]
      ⭕️ 🇷🇺⚔️🏁 Alaudinov stated that the operation of the Ukrainian Armed Forces in the Kursk direction is being directed by NATO.

      The commander of the Akhmat special forces noted that ‘the Ukrainians are unlikely to be able to formulate or carry out such an operation on their own.’
      ⭕ 🇷🇺🇺🇸 The U.S. does not plan to hold a new conversation with Russia at the level of the defense ministers of the two countries in the near future, the Pentagon told RIA Novosti.
      ⭕ 🇷🇺⚔️🇺🇦 Military group named after Nazi battalion involved in Kursk incursion.
      ➡️ One of Kiev’s battalions involved in the cross-border attack on Russia’s Kursk Region shares its name with a Nazi special operations unit that was active in Eastern Europe during World War II, Ukrainian news website Focus has reported.
      ➡️ Focus reported on Thursday that a Ukrainian military unit also called the Nachtigall Battalion had taken a group of Russian troops prisoner at the Sudzha border crossing between Russia and Ukraine. The formation is part of the 14th separate air force regiment of the Ukrainian Armed Forces, according to the outlet.
      ➡️ Russian officials have for years expressed concern over the growing role of far-right elements within the Ukrainian government and military, as well as the glorification of World War II-era Nazi collaborators in the country.
      Source: https://www.rt.com/russia/602391-kursk-incursion-ukraine-nazi/
      ⭕URGENTLY
      🇧🇾Alexander Lukashenko:

      Yesterday at 18:10, the Air Force and Air Defense Forces of Belarus were put on high alert. We call it readiness No. 1. Air Defense Forces on duty. The Armed Forces of Ukraine violated all rules of conduct and violated the airspace of the Republic of Belarus. In the eastern direction, very close to us in the Kostyukovichsky District. Therefore, the Air Defense Forces were put on full alert to intercept targets. There were about ten of them. Airplanes and a helicopter took off. And also the MLRS were put on high alert!
      ⭕ 🇧🇾 Lukashenko announced the destruction of airborne targets from Ukraine over the territory of Belarus and Russia, reports BelTA.

      Lukashenko announced that drones originating from Ukrainian territory may have been shot down over Belarus. He also reported that Minsk has provided Moscow with information regarding airborne targets from Ukraine that were downed near Yaroslavl.

      💠 @Strategika51:
      ⭕️ ⬆️ Deliberate Israeli airstrike on a refugee school in Khan Younes, Gaza Strip. Over a hundred dead, mostly women and children.
      ⭕️ Gaza Strip: At least two MK-84 bombs were dropped on a school housing 2,400 refugees in Eastern Gaza. The majority of those killed were young children.

      If this isn’t proper genocide, what is?
      ⭕ Belarusian armed forces 🇧🇾 on high alert after multiple Ukrainian violations of Belarusian airspace.
      Belarusian special forces arrive at the border with Ukraine 🇺🇦.
      ⭕ Four GBU-39/B bombs were used by the Zionist air force against the Khan Younes school, where over 2,000 refugees fleeing the bombardments were crammed.
      ⭕ The advanced, militarized Starlink variant, Starshield, is said to be operational in Poland and Romania.

      💠 @Fotros Resistance:
      ⭕ 📝READ: A powerful narrative that Israeli media and their Persian-speaking mercenary media affiliates are vigorously promoting is setting Mr. Pezeshkian against the military forces and the leader of Iran.

      Sometimes they (falsely) claim he has warned the leader, and other times they say he (falsely) has told the IRGC to attack Israel’s assets elsewhere.

      This report emphasizes that there is a significant effort to wage psychological warfare and create fear and panic among Israelis. We issue necessary warnings only when there is a real threat to the people.

      P.S.: Not only are they trying to create a fake atmosphere of discord among officials in Iran, but they are also attempting to incite various protests amidst a potential attack on Israel, which is clearly part of Israel’s ongoing plans.
      [In general, if any western media orifice mentions its PR is based on Iranian (or Russian) sources, consider it a lie, 99.99997% of the time. And perhaps, 90% of the time, consider it projection of what has been already attempted by the West or is in the works]

      💠 @Sputnik Africa:
      ⭕ ❗️The Russian Armed Forces continue to repel the attempted Ukrainian invasion into the Russian territory: MoD

      A Russian missile with a thermobaric warhead hit a temporary deployment point for foreign mercenaries on the southern outskirts of the town of Sudzha, killing 15 militants, the Russian Ministry of Defense stated.

      Russian forces prevented attempts by Ukrainian mobile groups to break through deep into the Russian territory in the areas of Ivashkovsky, Malaya Loknya, and Olgovka, the ministry reported.

      During the past day, the Armed Forces of Ukraine lost up to 175 soldiers and 36 armored vehicles, including 10 tanks and 21 combat armored vehicles, in the Kursk area, the body added.

      The total Ukrainian losses in the Kursk area amounted to 1,120 soldiers and 140 armored vehicles, including 22 tanks and 20 armored personnel carriers, the ministry noted.
      [So invasion force was much more substantial than 1,000, given mop up not nearly done. Or were reinforced steadily from within 404. These invasions have strategic calculations and aren’t as hopeless as all say.

      1. it normalizes invasion of Russia proper, without retaliatory tactical nuking. This reduces fear factor of Eurocrazies/West, and recruits more to the Pyre. And they’ve got nearly a billion bodies for meat grinders.
      2. if they can just maintain a toehold, when nuclear war goes live, and the expected coordination of defense of the Russian General Staff drops in efficiency and altogether in short term, then these sabotage teams can do a lot of harm, being already inside Russian borders, and perhaps run wild in European Russia west of the Urals.
      3. So both steps are prospective, for further moves down the road, and at insignificant expense of already condemned UkroNazis. No one will be able to match the ruthlessness and cunning of the AntiChrist…. and he works to dismantle the last barrier to rule from Jerusalem: the stubborn civilizational-states]

      ⭕ ❗️Possible Ukrainian missile debris found at the Kursk Nuclear Power Plant, Russia warns the IAEA

      The announcement comes amid a Ukrainian attack on the Russian Kursk region that has been ongoing for several days.

      “Ukraine’s reckless actions threaten not only the Russian nuclear facility, but also the entire global nuclear industry,” the Russian permanent mission to international organizations in Vienna said.

      ☢️ The discovery of fragments of what could be downed missiles was made on August 8, mainly in the area of the radioactive waste treatment complex, it specified to the International Atomic Energy Agency.

      “No direct bombing of the town of Kurchatov [where the plant is located] and the energy infrastructure has been detected yet, but the tense situation remains,” the mission added.

      For now, the plant is operating normally, the radiation level is normal. The relevant services are analyzing the fragments found, the Russian side says.

      Russia has asked the IAEA to inform other member countries about the situation at the plant as soon as possible.
      [Russia will be left NO choice. Dismantled disintegration or the thermonuclear obliteration of the satanically possessed West. What a binary choice!]
      ⭕ ❗️The Armed Forces of Ukraine lost up to 1,855 servicemen during the past day: Russia’s MoD

      Russian forces have hit foreign-made military equipment, including an M113 armored personnel carrier, an M198 howitzer, an L-119 gun, M777 howitzers, a Polish Oncilla armored personnel carrier, and an Israeli-made RADA RPS-42 air reconnaissance radar, the ministry reported.

      💠 @Yemen | Bab-el-Mandeb:
      ⭕ 🔴Breaking News🔴
      The official spokesman for Ansar Allah, Mohammed Abdul Salam:

      – A barbaric massacre committed by the enemy with full American support against displaced persons during their Fajr prayer inside a school in the middle of Gaza City.

      – We strongly condemn the Zionist fascism and we denounce the continued American support for Israel to continue committing crimes of genocide in Gaza.

      – Arabs and Muslims bear a great responsibility towards Gaza, and disgrace and fire will befall anyone who neglects their religious and humanitarian duty.

      – Negligence encourages the Zionist enemy to continue its unprecedented crimes of genocide.
      [So the latest massacre in Gaza today was at the dawn prayer time, calculated to enrage Muslims and bring on the long desired “clash of civilizations.”]

    • #38139
      Mr P
      Participant

      https://x.com/i/status/1821987048129229051

      According to the somewhat “odd” fella, Macgregor, the welcoming committee in Yemen came as a ‘sprise!

      “Roughly 70 israeli special forces along with a number of American mercenaries, they were tracked the moment they infiltrated Yemen and were then ambushed and killed.”

      What would the Apaches have done? Yup same same, only probably turn ’em over to the ladies for special handling. 

      • #38140
        AHH
        Blocked

        He’s a pisspoor liar. Note the movement of his eyes whenever he lies.. such as “70” zionazi SOFs/commandos with “embedded US mercs” – why such a low number? Was it really US troops with few embedded Zionists? And do Yemenis need any Russian ISR to tell them what moves on their turf? How did Felix Arabia defend herself so resolutely for some 8,000 years?? And so on.. the guy’s really breaking down into a sad clown show

        But one thing he is right about is the need to take the sky eyes outta the equation. It informs another need for Armageddon – there’s a chapter of the Qur’an named “Smoke.” The satanic side hasn’t put much effort into hypersonics and upgrading serious warjets and missiles because it always planned for such scorching of the skies that even birds won’t be able to fly. War should become reduced to largely land and sea, like the good old days, for 99% of human history

        • #38152
          Mr P
          Participant

          Well, maybe “odd” was too subtle. But everybody loves a ‘sprise, don’t they? I have a low opinion of the great hero.

          I don’t imagine the dead fellers walked, more likely choppered in. And if the natives are like the native of the Southwest, they heard ’em coming, and saw them too.  Anyway, they’re trying their excuses out with God, and probably told to go to hell.

          ……….

          Just a hint of exile to His Royalnesses gaol> “British government is threatening to extradite American citizens from the U.S. to be jailed in the U.K. for violating their rules about political speech online.” https://www.foxnews.com/media/uk-police-commissioner-threatens-extradite-jail-us-citizens-over-social-media-posts-we-come-afte

          Maybe Scott has such a trouble on the horizon. Off with those troublesome fellows to airstrip one! Just following orders!

          I am remembering his excellence the highly esteemed PM saying recently We will stop at nothing! 

           

    • #38155
      AHH
      Blocked

      a watershed moment has been reached.. a massacre too much this morning? The region prepares to deal with the irredeemably satanic West…….

      💠@Fotros Resistance:
      ⭕ — Notable:

      Iraq’s most influential Shia cleric, Ayatollah Sistani, has condemned Israel’s bombardment on al Tabin School in Gaza, killing over 100 Palestinians.

      He has also condemned the attack on “regional countries’ sovereignty and assassinations of the important leaders of axis of resistance” which means the assassinations of Hamas former leader Ismail Hanieh in Tehran & Hezbollah commander Fuad Shukr in Dahieh, southern suburbs of Beirut.

      Iraqi resistance groups, who are primarily shia, may see this as a “green light” to further mobilise and fight against Israel & its allies.

      This is Ayatollah Sistani’s 2nd major statement on Gaza since the beginning of the war. The first was on October 11.

      💠@Yemen | Bab-el-Mandeb:
      ⭕ Political Office of Ansar Allah:

      – The Zionist entity continues to commit bloody massacres, one after another, in an unprecedented violation of Palestinian blood.

      – Arab and Islamic governments still remain silent and incapacitated, as if they neither see nor hear nor speak.

      – We condemn and denounce the latest Zionist massacre against worshippers in the Al-Taba’een school in the Al-Daraj neighborhood in the Gaza Strip.

      – This brazen escalation has coincided with the Qatari-Egyptian-American statement, which grants the perpetrators more time to continue violating Palestinian blood.

      – The Qatari-Egyptian-American statement provides political cover for the leaders of the Israeli enemy to continue their rampage throughout the region.

      – Until when will Arab and Islamic regimes wait, and whom do they expect to take action in fulfilling their humanitarian, Islamic, national, and pan-Arab duties?

      – We extend our sincere condolences and sympathy to the families and loved ones of the unjustly killed and martyred victims.

      – We affirm that these sacred and pure bloods will not go in vain; rather, they will, God willing, lay the foundation for the downfall of the entity and the triumph of the cause, and the restoration of rights.

      – We renew our pledge and loyalty to Palestine and its people and resistance, affirming that Yemen will continue its popular solidarity and support, as well as military escalation.

      ### Yemen Scholars Association:

      We call upon the humanitarian conscience and Islamic affiliation in light of the thousands of bloody massacres committed by the Israeli enemy over the past 10 months.

      – The Israeli enemy intentionally and brutally escalates its aggression against Palestinian Muslims, violating all sacred taboos.

      – The perpetration of this horrific massacre by the enemy necessitates that all Arab regimes, peoples, and armies fulfill their duty to support and declare a general mobilization.

      – This massacre imposes on all Arab regimes, peoples, and armies the responsibility to engage in genuine and sincere jihad in the name of God and for the oppressed in Gaza.

      – The scale of the tragedy and the unprecedented Israeli savagery places the responsibility on all Muslims, especially leaders and scholars, to fulfill their duty of supporting the oppressed in Gaza.

      – Israeli brutality places the responsibility on Muslims to deter the Zionist entity and seek retribution for its numerous crimes and bloody massacres.

      – We call upon the Axis of Jerusalem, Jihad, and Resistance to respond with a forceful and shocking retaliation against the enemy and inflict pain upon them as much as possible.

      – We reaffirm the legitimacy of targeting the presence and movements of the American forces that support the Israeli enemy and participate in every crime and massacre, every drop of blood that is shed.

      – Targeting warships, destroyers, and aircraft carriers wherever they may be is a legitimate right and a mandatory duty until the United States refrains from supporting Israel.

      – The continued perpetration of massacres by the enemy increases the faith-based, religious, and humanitarian responsibility on Muslims and exposes those who remain neutral, passive, or indifferent to the wrath of God.

      – We condemn the Zionist savagery and Israeli Nazism, and we denounce the feeble outcomes of the Islamic Cooperation Organization and its weak statement.

      💠@Strategika51:
      ⭕ Information blackout at Kursk.
      ⭕ The last instructions given to Russian forces were to take no prisoners. “No quarter given”.

      Parents of Russian reservists who spent their military service in other regions are worried about the disappearance of their sons, given that President Vladimir Putin signed a decree prohibiting the sending of conscripts to the Northern Operations Zone (Vostok). It seems that the Russian government has overruled the decree.

      For the moment, the fog of war is total.
      ⭕ Information on the entry of Georgian mercenaries from the Ukrainian Foreign Legion into Belgorod Oblast.
      [if true, this is the second Russian region invaded in less than four days…]

      💠🌎🛡GEOPOL360🕊🌍:
      ⭕ 🇬🇪 🇺🇸 “Georgia is ready to restore relations with the United States to strengthen cooperation and bilateral ties,” Georgian Prime Minister Irakli Kobakhidze said after a meeting in Tbilisi on Saturday with U.S. Senator Jeanne Shaheen and Congressman Mike Turner.

      💠@DDGeopolitics:
      ⭕ ❗️Ukraine violated the Italian constitution by attacking Russian territory – il Fatto Quotidiano

      The article refers to the fact that the AFU used Italian weapons during the invasion of the Kursk region without the authorisation of the Italian parliament. Zelensky thus crossed all the red lines and dragged Italy into a direct military conflict with Russia.

      “The government is plunging Italy into a situation of maximum danger and endangering world peace itself,” the publication warned.
      [if the moment weren’t so dire, one could roll on the floor in hysterical laughter at the sheer idiocy of the Europeans, being led to their total everlasting extermination like willfully dumb sheep]
      ⭕ 🇧🇾🇺🇦 After the drone strike on Belarus (as reported by President Lukashenko), the republic is reinforcing its troops on the border with Ukraine.

      According to the Belarusian Ministry of Defense, Lukashenko has “issued instructions to strengthen the troop groupings on the Gomel and Mozyr tactical directions to respond to any possible provocations.”

      These are the regions bordering Ukraine. Special forces, ground troops, and missile troops, including the Polonez rocket systems and Iskander systems, are being deployed there.
      ⭕ Ministry of Foreign Affairs of Belarus:

      We perceive with great concern and sorrow the events unfolding in recent days in the Kursk region of the Russian Federation.

      We unequivocally condemn the actions of Ukrainian armed formations that have embarked on this senseless adventure, which exacerbates the conflict in our region.

      Attacks on civilians, peaceful villages and cities, deliberate damage to infrastructure, and acts of terrorism are unacceptable to us.

      All these actions are carried out by the Ukrainian side against the backdrop of statements from its political leadership about readiness for negotiations. In reality, such incursions and escalation only delay the prospects for resuming and ending the conflict, which Belarus consistently advocates for.

      We express our support and solidarity with the residents of the Kursk region. We offer our condolences to the families and loved ones of the deceased and wish a speedy recovery to the injured.
      ⭕ Hamas Movement:

      – There were no militants in the Al-Tabi’een School and the enemy army is lying again and fabricating ridiculous excuses to target civilians.

      – The strict policy followed by fighters of all factions is not to be present among civilians to spare them from Zionist targeting.

      More than 110 people were martyred, mostly women and children in the brutal strikes on the “Tabiin” school that shelters more than 2500 people.

      The school was targeted with at least 3 missiles including at least one [US] Mark-84 2000-pound bomb.
      ⭕ The Syrian Ministry of Foreign Affairs and Expatriates stated:

      The Zionist occupying entity has continued for over ten months to commit acts of genocide against the defenseless Palestinian people, in the sight and hearing of the world, amidst international helplessness and paralysis in taking any measures to stop the Israeli killing machine due to Western protection of this criminal entity.

      This morning, August 10, the fascist occupying entity added another heinous massacre to its criminal record by targeting a school in the center of Gaza Strip that shelters Palestinian refugees who sought refuge there to escape the Zionist hell. This resulted in the death of more than a hundred martyrs, including children, women, and the elderly, and caused dozens of injuries.

      The Syrian Arab Republic, while condemning this horrific massacre, affirms that the Israeli entity’s persistence in shedding innocent blood in Palestine, Lebanon, and Syria will only increase the resolve of the people of this region to resist and respond to its crimes, despite all the Western support it receives.

      Syria salutes the legendary resilience of the Palestinian people in the face of their occupiers over the decades and reaffirms its steadfast and strong support for their just struggle to obtain their legitimate national rights.
      ⭕ Hezbollah has issued the following statement:

      A horrific new massacre has been committed by Israeli occupation forces at the Al-Tabi’in School in the Gaza Strip, claiming the lives of more than a hundred martyrs and injuring dozens more while they were performing the Fajr prayer. This massacre further deepens the bloodshed of the oppressed Palestinian people, under the watchful eyes of the entire world, which remains indifferent and bears moral and ethical responsibility for the crimes and massacres committed by the Zionist enemy.

      What the enemy’s government has done confirms that it is continuing its genocide against the Palestinian people and that its real choice is killing and committing massacres. The talk of a ceasefire and setting new dates for negotiations is nothing but lies and deception that will not fool the Palestinian people, their resistance factions, and the support fronts, who are increasingly convinced of their determination to resist and work with all their might to stop the slaughter and prevent the enemy from achieving its declared and hidden goals.

      We in Hezbollah strongly condemn this horrific massacre and call on all the free people in the world to denounce it, intensify protests against the murderous Israeli government, and launch the broadest renewed campaign of solidarity with the children, women, and men of Palestine who have been subjected to the most heinous massacre for more than ten months.

      We extend our deepest condolences and sympathy to the patient, oppressed, and courageous Palestinian people, asking Almighty Allah to grant mercy to the righteous martyrs, healing to the wounded, and to bestow upon them swift relief and imminent victory.

      Saturday, 10-08-2024
      05 Safar 1446 AH
      ⭕ Hezbollah:

      The talk about a ceasefire and setting new dates for negotiations is nothing but lies and deception that will not fool the Palestinian people, its resistance factions, and the support fronts.

    • #38156
      AHH
      Blocked


      ☝️ can ignore the latter part as he reviews the same Hezbollah drone series we had on the site last week..

      💠 @DDGeopolitics:
      ⭕ 🇷🇺⚔️🏁 War Correspondent Andrey Rudenko reports:

      In the Kursk direction, the enemy is using chemical munitions.

      Moreover, these shells are of NATO origin. This means that NATO representatives have provided chemical weapons to the Ukrainians.

      The war is taking a new and much more terrifying turn.
      Via: @rtrDonetsk

      💠 @Intel Slava Z:
      ⭕ 🇧🇾🇺🇦⚡️The KGB of Belarus has introduced a counter-terrorism operation regime on the border with Ukraine.

      The KGB called on residents of the border region to “remain calm and obey the demands of the security forces.”

      Let us recall that the counter-terrorist operation regime was previously introduced in Russian regions bordering Ukraine.

      💠 @ejmalrai:
      ⭕ Without the unconditional support of the #US, the arms of the US & #Germany, the conscious tacit support of the West, and the US pressure on the ICC:

      #Israel will never dare to commit so many 1000s of massacres in 10 months. Never believe that Israel is the only one responsible
      ⭕ Israel attacked #Yemen, #Beirut, #Tehran, #Damascus to force all these countries and non-state actors to retaliate so that the #US and its allies can rush to the ME with large forces (this is exactly what happened). This is a clear indication that @Netanyahu wants an all-out war with a huge military led by US forces on his side, to fight on his behalf.

      As soon as there was talk of negotiations and a possible ceasefire from the US, Qatar and Egypt, Netanyahu blew it up. He prefers to take advantage of the large US forces in the ME and provoke all his enemies into a wider war.

      If Netanyahu stops the war, he will fall. If he continues to provoke a wider war, he will survive. The fate of Israel is in the hands of a man fighting for his own survival
      [i strongly disagree all this has anything to do with just one man’s political career, but the principle of preventing “peace” at all costs holds. The West Delenda Est]
      ⭕ To US taxpayers:
      Guess who is paying for the #US to send thousands of troops, air force and navy to the Middle East to rescue a war criminal who wants all-out war (@Netanyahu) and is attacking several capitals and states just to stay in power?

    • #38160
      Mr P
      Participant

      At minute 33:00 + Larry Johnson says that he’s heard, second hand, that as of last week the zionists were planning a pre-emptive nuclear strike on Iran. Not a ‘sprise, but nevertheless, if plans are still in operation a dire prospect indeed. see https://youtu.be/IaButaLTHIg  Earlier in the fairly lengthy video he speaks of Ritter’s, and his own (expected) prosecution(s).

      • #38164
        AHH
        Blocked

        Russia may preposition her troops in Iran manning the air defense and other weapons systems as a fire shield for the entirety of Iran, but it won’t be enough. If they lose a few hundred men, it won’t be casus belli to launch the Last War.

        The zionazis already took Russia’s measure – remember those 18 or so Russians deliberately used as shield to draw Syrian S300s onto them? Any rational leader will choose the 160M Union State population over a few hundred soldiers performing their job description. It is precisely this rationality and measured responses being used against all the civilizational-states right now…

        So a nuke attack on Iran remains in the cards. The zionazi West and her rabid offspring will still need to be defeated the old fashioned way, even after they launch the WMDs — short sword strokes, tanks in glowing Berlin, a hunt for chosenites hiding behind and under every rock and tree…. that is the plan anyhow, but the devil is in the details.

        And the AntiChrist was foretold to be exceptionally cunning and ruthless, and that his will would triumph over all rivals and opposing alliances, until he encounters the real Messiah. How to defeat an Enemy without responsibility or care for his side??? Who hates ALL humanity with equal vigor? Our task is to hold on, and to endure, through bitter turns in fate…

      • #38165
        amarynth
        Keymaster

        Yeah, there are two ways that the Scott Ritter thing can go.  They can start rolling up his friends and those ones should be prepared.  I have spoken here and there.  Some of us have hard experience with these kinds of issues, and they are not legal issues.  Raided?  I once laughed and told the raiders that if they wake my kids, I’m gonna beat them up or call their mothers and tell them what they are up to.  Or, they can ‘Assange’ him, depending on what the objective is, because Scott so far says it is to keep him quiet or to stop his big anti-war demonstration.  This is not all that it could be.  And he sticks to the legal issues.  When is someone going to say to him that his American Dream does not exist any longer?

        Yes, a pre-emptive strike I would guess is first on the list of possibilities and this has been raised in many places.  But nuclear?  We are dealing with decidedly insane people.

    • #38166
      Mr P
      Participant

      imho Scott’s legal fate depends on the venue, and the judge. I’m not holding my breath. In non-political matters smart lawyers make friends with the clerks and especially the clerks of the callender courts, I have been assured that getting a case heard by the right judge matters very much – of course those fellas trying to put said client away do the same things, and they draw lots of water.. That said, it’s also generally true that an attorney represents not only his client, but also the class of his client. Only some realise this.

      Johnson’s scuttlebutt minds me to recall the story of the F35 “shot down”. So do the F22’s.

      I am remembering too, that these fellas always double, ’cause they’re stupid, and losing, and running out of options.

      In the history generally cities were the targets of big bomb events – and we see that happening in Palestine. It may be more than a few hundred Russian experts…the thing may be called pre-emptive, but it seems more like provocation to create “consent” for a big campaign…to get the neokonz to waste Iran.

      Soon enough we’ll probably find out.

    • #38167
      AHH
      Blocked


      A preemptive move by the zionazis could be a terrible internal FF – whether inside Zion or the CONUS outpost. Tisha B’av (9th of Av) has been messaged a lot in recent weeks…


      A lot of good evidence is presented here why the zionazis seek a first strike or preemptive move: Postol demonstrates not only are they wide open to ballistic attack (like rest of West) lacking adequate such defenses, but that per data of 2019 Saudi Abqaiq attacks with cruise missiles that Iran possesses gps-free guidance systems that are ultra accurate homing for even their slower cruise missiles and shahed drones. So they would not only get hammered for months and years, but these would be mostly precision strikes. Zion (above ground) can really be leveled. This knowledge puts in context the ongoing messianic madness, that they STILL forge ahead into the Abyss!!

    • #38174
      AHH
      Blocked

      OK I had been traveling with family and avoided most of the horror, so back now, to (the more sanitized) Prof Marandi, made of tougher stuff..

      💠 @Seyed Mohammad Marandi:
      ⭕ Listen to the screams of the Holocaust  |media|
      ⭕ Arab dictatorships that cooperate with Zionist rapists and childkillers should be very fearful.
      People are growing very angry.
      #GazaHolocaust  |media|
      [This is not hyperbole. These are beginning to be seen by the Resistance as Russians came to see their Ukie “brothers” — and with perhaps similar effects. And the unforgivable shame is amplified by (1) their claims of being leaders of “arabs” and “custodians of the holy mosques” and (2) by being among top world purchasers of arms, decade after decade — any single GCC has enough arms to field ten armies.. and they sit and watch and watch..]
      ⭕ Why does Baku oil still flow through Turkey to fuel the war machine of childkillers and rapists?
      ⭕ Where are all those fake Western supporters of human rights? Where are all those hypocritical Western advocates of women’s rights?

      150 Palestinians were slaughtered in a single airstrike early this morning.
      ⭕ The Zionist allies of the collective West have slaughtered 150 innocent Palestinians who were sheltering in a school this morning.

      Cowardly Western diplomats, mainstream media journalists, and elites are all partners in these crimes against humanity.
      #GazaHolocaust
      ⭕ 150 innocent people were slaughtered this morning in a single airstrike.
      150 innocent people.
      #GazaHolocaust
      ⭕ The US regime is an equal partner in the #GazaHolocaust

    • #38190
      AHH
      Blocked

      The coming Denouement will be determined on the ground. Air power, even nuclear, does not win wars..

      Even though it began years ago, when it became clear what was coming with the serial genocides in Syraq and Afghan and Yemen — all linked to assuring Greater Israel and rise of the AntiChrist’s Pax Judaica — the current delay is linked to dispersal of forces in anticipation of WMDs. In a way the Axis of Resistance mirrors the imperial strategy of lily pads or bases — but of hardened underground cities and outposts region-wide, desert hideouts, mountain fastnesses. Too many to be taken out, and even with nukes.

      Their response, when this door is opened, must be to swarm and overrun with countless numbers, of which they enjoy a massive advantage. Even the preemptive nuking of most civilian centres could not, would not, long delay this coming response.

      Indeed, part of the Kursk gambit, and earlier suicidal meat attacks against Russia, was to try to elicit a Russian nuclear response, to then normalize the use against similar coming meat waves on the Resistance side in the Holy Land.

      Pax Judaica, like all predecessors seeks to garb itself in cloak of goodness or respectability, and in its unique case of twisted victimhood, so they cannot appear to be aggressors, to better rule the coming order. That Gaza has completely exposed the demented doesn’t change their calculations; they are spiritually blind! Thus the iron script: “The Other” must be shown to initiate the catastrophe. If Russia will not oblige in helping normalize this behavior, a FF attributed to Iran may do.

      The satanic side is hamstrung as with all prior expeditionary aggressors in limited logistics, numbers, lack of moral ground, and with time, now achieved, decreasing enemy fear factor as their weaknesses are teased out and the strengths increasingly nullified. So they need to resort to black energy and open hatreds to maintain group cohesion, in part achieved with daily atrocities of livestreamed genocide, as they await the “hail mary” move of exterminating most arabs around them, including GCC, Egypt, Jordan compradores, as their masses are little different from Palestinian in enmity and their potential could easily be raised with regime change.

      The terminally vicious cycle underway now is how the zionazi can get in the first Apocalyptic blow, which was prophesied to result in the extermination of almost ALL arabs, save the Greater Syrians, and the coming counter-extermination riposte. Very dark days ahead. Most jews and arabs may cease to exist quite shortly. Most of the jews will ironically end up scapegoated in the West, and face a new holocaust there, a la 1940s. Satanism is a dead end!

      💠 @DDGeopolitics:
      ⭕ ℹ️ Why doesn’t Putin Declare War?: International Law and External considerations

      ➡️ Throughout the SMO in online commenting in the chat and of course on other channels there is a hope that Putin will ‘upgrade the Special Military Operation’ to a war by declaring war. This would not actually accomplish anything and we are going to set out why.

      ➡️ Since 1945 the threat of force and use of war have been illegal under the United Nations Charter – unless authorized by the UN Security Council. As the USA, France and the UK sit on that body that is never going to happen and China would not vote for it. This also explains in large part why the US has never declared war since 1945.

      ➡️ When a nation declares war all countries that are not cobelligerents with that country have to immediately stop selling any and all weapons that country or they will be in breach of international law and subject to sanctions either from the UN Security Council or the General Assembly. This would mean China, Iran, India, Brazil, Israel (yes – Israel, really) and other countries which supply Russia with either component parts or the machinery and component parts needed to make the tools and machines Russia needs to make weapons will be required to stop supplying these under international law. Further all those countries would need to detain any Russian soldiers on their territory and impound any ships or military aircraft or be considered a cobelligerent.

      ➡️ Declaring war would thus put Russia on the wrong side of international law and force its de facto allies or neutrals to either declare war on Ukraine or else stop trading with Russia on these components – they would not do that unless they themselves were pushed to the wall by Ukraine or the West.

      ➡️ Ukraine has not declared war either for these reasons as it would push all of NATO into a war – but not all of NATO wants an outright war, and it could fracture the alliance something not even governments like Slovakia and Hungary want.

      ➡️ Anything Putin does or does not authorize does not need a declaration of war. He just needs to decide – with agreement of the Duma – that it is necessary. The Duma has been more hardline than Putin but he is reluctant to escalate things where WW3 could become inevitable and Russia only gets support so long as it demonstrates it is doing everything it can to stop that.

      🐻 Being on the right side, doing the right thing, and keeping on the right side of the law are not easy. It’s why Russia seems to play on hard mode and Ukraine on easy mode. But this is also why Ukraine is losing the war and diplomatically Russia is already being treated at the victor.

      💠 @Intel Slava Z:
      ⭕ 🇷🇺🇺🇦⚡️Significant forces of Ukrainian formations have been spotted in the Belovsky district of the Kursk region.
      In the regional center, which is 100 km from Kursk and 20 km from Sudzha, an evacuation of the population has been announced.
      Militants fired at a local hospital.
      [Subsequently this was said to be psywar regarding Belovsky; but the sabotage bands roam as far as they can.. It was premature to speak of mop up by weekend]

      💠 @Strategika51:
      ⭕ At this rate, the whole NATO is entering Western Russia…😵‍💫😵‍💫😵‍💫
      ⭕ At least five brigades, many of them special forces from several countries, the rest made up of common criminals released from prison. This is the information the Russians were able to extract from the enemies captured at Kursk.
      This is not an incursion.

      • #38194
        Mr P
        Participant

        Yes, AHH, very nicely put. Previously we mentioned that they will be over-run. You’ve now illuminated that considerably.

        The argument against war declaration is superb.

        I commented on Dr Postol’s video see https://sovereignista.com/globalsouthforum/topic/the-hearty-salon-01-aug-2024-open-thread/#post-38183  and also on the explosion in China port aboard ship.

        Evidently the nazis are hurried by circumstance.

        12-13 August…(TISA B’AV) … well, the zionists have not previously hesitated to do false flag attacks against Jews. That has a long long history. Yet the Persians have a moral imperative. I would speculate that the zionist may even add to a Persian action by attacking themselves – selected internal targets – perhaps even nuking Gaza, and pointing to the crime as a Persian one, and a false “proof”. The smallest workable nuclear gadget is said credibly to be on the order of 0.5 kilotons. A manageable effect, highly propagandistic though.

Viewing 63 reply threads
  • You must be logged in to reply to this topic.